Evidence · NZ Election 2026

Every question, every answer, every source

Everything the study collected, as it was collected on 5 October 2026. Read any answer in full, or download the tables behind every figure in the study.

questions
174
voters the questions were written as
32
answers collected, of 820 planned
815
answers compared like for like
800
pairs of national and town answers
124
answers with sources recorded
774
answers that showed a link
304

01

Every question, with its answers

Each question was written as a voter would ask it and went to all four assistants. Some were also asked from a town. Open a question to read every answer to it in full.

Showing 20 of 174 questions

02

The tables behind the study

Every figure on the study page comes from these tables. They are CSV files, which open in any spreadsheet.

  • Questions

    nz-election-2026-questions.csv

    One row per question.

    Question id, report reference, question, voter, issue, towns it was also asked from, answers per assistant

  • Answers

    nz-election-2026-answers.csv

    One row per answer, with its full text.

    Answer id, question id, assistant, town, words, parties named, showed a link, websites recorded as sources, compared like for like, full text

  • Sources by answer

    nz-election-2026-sources.csv

    One row for each website recorded as a source of an answer.

    Answer id, question id, assistant, town, website, publisher type

  • Checks against official sources

    nz-election-2026-checks.csv

    One row per statement checked.

    Check, answer id, assistant, what the answer said, verdict, what the source says, source, date

  • Who to vote for: coding

    nz-election-2026-guidance.csv

    One row per answer to the eight questions that asked who to vote for.

    Answer id, question id, assistant, what the answer did, the words that show it

  • Location and national answers

    nz-election-2026-towns.csv

    One row per question asked both nationally and from a location, for each assistant.

    Question, town, assistant, both answer ids, parties named nationally and from the town, same parties

Use these tables to trace findings back to the original questions and answers. The full text of each answer is also on this page, under its question.

03

Read in full and checked

Some answers were read in detail or checked against official sources. Those appear on the study page, beside the findings they support.

ChatGPT · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

Dunedin Hospital

As of 4 October 2026, the important distinction is that “the new Dunedin Hospital” is not yet a functioning replacement hospital. One new building is completed and is about to start clinical operations; the much larger inpatient hospital — including the new ED, ICU, inpatient wards and main theatres — is still being built and is not due to take patients until 2031.

What patients can actually use now

The existing Dunedin Hospital on Great King Street remains the working acute/tertiary hospital. Its 24-hour emergency department, inpatient wards and surgical theatres are still there, along with services such as BreastCare, the NZ Artificial Limb Service and Gibson Day Unit. Health NZ says these services will eventually move into the new inpatient building in 2031. New Dunedin Hospital | Project Whakatuputupu

There is also a new cancer-treatment capability already operating at the existing hospital: a new linear accelerator (LINAC) began treating Southern-region cancer patients in July 2026. This is important for patients, but it is not evidence that the new inpatient building is operating. New cancer treatment machine now treating patients in Dunedin | Beehive.govt.nz

The new outpatient building: built, officially opened, but only just beginning clinical operations

The five-storey, 15,000 m² Outpatients | Whare Mātūtū was officially opened on 28 August 2026. It is the first completed stage of Project Whakatuputupu and cost about $440 million. New Dunedin Hospital outpatient building officially opens | Beehive.govt.nz

However, “officially opened” and “open to patients” are different things. Health NZ's latest published timetable says clinical care begins in October 2026, following staff transition and commissioning. As of October 4, the public information I can verify still describes the clinical opening as October rather than giving a confirmed day, so I would not yet tell a patient that all outpatient services have moved into the building. New Dunedin Hospital | Project Whakatuputupu

Once operational, Whare Mātūtū will bring together:

That is particularly relevant to someone dependent on specialist appointments: the first tangible benefit of the new hospital is in planned/specialist care and diagnostics, not emergency or inpatient treatment.

Health NZ estimates that, once fully operational, the outpatient building will provide capacity for approximately 1,700 additional day-surgery procedures, 13,300 additional medical-imaging appointments and 2,700 additional medical-day-stay appointments per year. Those are projected additional capacities, not guarantees that individual waiting times will fall by those amounts. New Dunedin Hospital outpatient building officially opens | Beehive.govt.nz

What is still being moved

The outpatient transition is deliberately staged rather than everything switching over on one day.

Health NZ says many services will move into Whare Mātūtū as it opens, with other services moving by early 2027. Local reporting confirms that a number of outpatient services are planned to move in October, with the remainder expected to relocate in early 2027, while additional clinical and support staff are recruited. New Dunedin Hospital | Project Whakatuputupu

So if you have a specialist appointment in the coming months, don't assume that because it is a “new Dunedin Hospital” service it will automatically be at Cumberland Street. Your appointment information should specify the location.

What is not open: the big inpatient hospital

This is the much more consequential part of the project.

The 11-storey, approximately 72,000 m² inpatient building is being constructed on the former Cadbury site. Structural steel began going up in July 2026; this is therefore very much an active construction site rather than a hospital treating patients. New Dunedin Hospital takes shape as steel goes up | Beehive.govt.nz

It is intended to contain:

  • 351 inpatient beds at opening, with provision to expand to 404;
  • a new/expanded emergency department with 58 spaces;
  • 20 short-stay surgical beds;
  • ICU and high-dependency beds;
  • inpatient wards;
  • the main operating-theatre suite;
  • larger day-surgery theatres;
  • 22 operating theatres, with capacity for 24. New Dunedin Hospital | Project Whakatuputupu

The new inpatient and outpatient buildings will ultimately be connected by an overhead bridge across St Andrew Street. New Dunedin Hospital | Project Whakatuputupu

The dates that matter

Stage Position on 4 Oct 2026 Patient date
Enabling/site works Completed —
Outpatients / Whare Mātūtū Building complete; transition underway Clinical care starts October 2026
Remaining outpatient relocations Transitioning Early 2027
Inpatient building Foundations completed; steel/construction underway Practical completion late 2030
Inpatient hospital Not treating patients Patients expected from 2031
ED/inpatient wards/ICU/main theatres Remain at existing hospital for now Move in 2031

The government's current construction programme has the inpatient building in main construction through 2030, with practical completion scheduled for late 2030 and patients expected from 2031. New Dunedin Hospital construction contract signed | Beehive.govt.nz

What this means for Otago and Southland

The useful way to think about the project is two quite different benefits separated by about five years.

2026–27: the new building improves the planned-care side of the system — specialist consultations, scans, day procedures, outpatient treatment and some elective surgery. Health NZ says the facility is intended to serve about 352,000 people across the Southern region. New Dunedin Hospital outpatient building officially opens | Beehive.govt.nz

2031 onward: the new inpatient building is supposed to replace the ageing acute hospital infrastructure and bring together the emergency department, inpatient care, ICU/HDU and major surgical facilities. The existing hospital's inpatient wards, theatres and ED are specifically listed as services that will remain at Great King Street until that move. New Dunedin Hospital | Project Whakatuputupu

So, in practical terms, the headline “new hospital” is currently only partly true. By the time New Zealanders vote in the 2026 election, Dunedin should have a new outpatient facility coming into clinical use, but the central acute-hospital component is still a five-year construction project.

One important caveat when judging the project

The hospital you are getting is not exactly the hospital originally envisaged.

The Government's 2025 reset committed to an inpatient building with 351 beds at opening, expandable to 404, rather than the earlier versions of the project. The Government says the $1.88 billion programme is now being delivered within the reset scope; critics of the reset have argued that the reduced scope means less capacity than previously planned. Those are competing political interpretations, so I would treat the 351-bed/404-bed design and the 2031 timetable as the concrete facts, rather than adopting either side's characterisation. Decision reached on Dunedin Hospital | Beehive.govt.nz

For your particular concern — reliable access to specialist appointments over the next few years — the most immediately relevant question is therefore not simply “Will Dunedin get a new hospital?” It is whether the October 2026 outpatient opening and its 2027 completion of the service moves actually translate into more specialist appointments, imaging and elective procedures, because that is the portion of the project that can affect your care before 2031.

And for emergency/inpatient care, the answer is much more straightforward: you are still relying on the existing Dunedin Hospital until 2031.

Primary sources worth checking

Health New Zealand — New Dunedin Hospital project page

Health New Zealand — Outpatient Building official opening

Health New Zealand — current Dunedin Hospital information

Government — inpatient construction contract and timetable

This gives you a factual baseline for assessing the hospital issue in the 2026 election without telling you how to vote. New Dunedin Hospital | Project Whakatuputupu

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 5 October 2026 · shown as ChatGPT gave it, not a verified account

ChatGPT · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

You are asking a practical question: what will actually change for a person in Otago or Southland who needs specialist care, and what is available now versus still to come? The short answer is that the new Dunedin Hospital is being delivered in two major stages: an outpatient/diagnostic building first, then the main inpatient hospital later. New Dunedin Hospital | Project Whakatuputupu

What is open and treating patients now?

There is an important distinction: the new outpatient building (Whare Mātūtū) has opened, but the full new hospital is not yet operating. New Dunedin Hospital | Project Whakatuputupu

New Dunedin Hospital Outpatient Building (Whare Mātūtū) — operating from late 2026

The first stage is the five-storey outpatient building at 360 Cumberland Street. It brings together planned specialist and diagnostic care that previously operated across different locations. Opening soon: New Dunedin Hospital Outpatients | Whare Mātūtū

Services being delivered from this building include:

  • Specialist outpatient clinics (medical, surgical and allied health appointments)
  • Radiology and planned diagnostic services:
    • MRI
    • CT
    • X-ray
    • ultrasound
  • Medical day treatments, including infusion therapies
  • Day procedures and planned surgery in the Day Procedure Unit Opening soon: New Dunedin Hospital Outpatients | Whare Mātūtū

The building includes:

For someone relying on specialist appointments, the immediate practical benefit is mainly:

What is still at the current Dunedin Hospital?

The existing hospital on Great King Street continues to provide major acute services, including:

The new outpatient building is not the emergency department. Emergency care remains at the current Dunedin Hospital until the inpatient stage is complete. Opening soon: New Dunedin Hospital Outpatients | Whare Mātūtū

What is still being built?

Stage 2: New inpatient hospital — expected 2031

The second stage is the larger inpatient building. It is planned to include:

Construction has moved from foundations into the main vertical build phase, with structural work underway. Milestone moment for new Dunedin Hospital | News | CPB Contractors

Expected timeline

Stage What happens Expected timing
Outpatient building construction Building, equipment installation, commissioning 2022–2026 New Dunedin Hospital | Project Whakatuputupu
Staff transition and preparation Moving teams, testing systems, preparing services September 2026 onward New Dunedin Hospital | Project Whakatuputupu
Outpatient building operational Specialist clinics, imaging, day treatment services Late 2026 New Dunedin Hospital | Project Whakatuputupu
Some additional outpatient moves Remaining services transition By early 2027 New Dunedin Hospital | Project Whakatuputupu
Inpatient building construction Main hospital construction 2025–2030 New Dunedin Hospital | Project Whakatuputupu
Full inpatient hospital operational Wards, ED, theatres, ICU and remaining moves 2031 New Dunedin Hospital | Project Whakatuputupu

What this means specifically for Otago and Southland patients

For people travelling to Dunedin as the tertiary referral centre, the benefits are intended to be concentrated in areas such as:

The bigger change — a new emergency department, inpatient wards, ICU, and the full acute hospital environment — does not arrive until the inpatient building opens in 2031. New Dunedin Hospital | Project Whakatuputupu

For your 2026 election considerations, the relevant factual questions to compare across parties would include:

  • whether they support the current delivery timeline,
  • how they plan to staff the new facilities,
  • how they will fund specialist services and waiting-list reductions,
  • whether they propose changes to the hospital’s scope or operating model.

Those are separate questions from the construction status itself: the physical project is moving ahead in two stages, with outpatient care first and the full hospital later. New Dunedin Hospital | Project Whakatuputupu

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 5 October 2026 · shown as ChatGPT gave it, not a verified account

Gemini · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

Navigating a long-term health condition while relying on specialist care makes the progress of the new Dunedin Hospital a critical issue for you, especially when weighing your vote in the 2026 general election.

The project is split into two primary components: the Outpatient Building and the Inpatient Building.


What is Open and Treating Patients Now

  • The Outpatient Building (Whare Mātūtū): Officially completed and opened its doors in August 2026.
  • Services Provided Here: This purpose-built facility houses ambulatory services, specialist outpatient clinics, planned radiology, day procedures and medical units, a transit care unit, and pathology. If you have scheduled appointments with hospital specialists, follow-up checks, or outpatient scans, these are shifting or have shifted into this modern facility.

What is Still Being Built or Moved

  • The Inpatient Building: This is the massive core of the hospital project that will house acute services.
  • Current Status: Major structural work is underway. The first batch of structural steel for the inpatient building arrived on site mid-2026, and construction is visibly rising.
  • Services Yet to Move: Critical acute care functions—such as the Emergency Department (ED), operating theatres, intensive care, inpatient wards, and specialized mental health emergency units—continue to operate out of the older, existing Dunedin Hospital buildings until the inpatient structure is finished.

Expected Dates and Timeline for Future Stages

  • Outpatient Building: Fully complete and operational (Completed August 2026).
  • Inpatient Building Construction Completion: Scheduled for completion around 2031 (with varying target projections spanning towards the end of the decade depending on fit-out phases).
  • Full Clinical Commissioning and Transition: Moving acute services, inpatient beds, and complex surgical units from the legacy hospital into the new inpatient building will follow structural completion, meaning full integration for Otago and Southland patients will take place progressively closer to the 2030/2031 horizon.

As you consider your vote, how do you feel the current pace and staging of these health infrastructure developments align with your expectations for regional healthcare access?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 5 October 2026 · shown as Gemini gave it, not a verified account

Gemini · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

Navigating the healthcare system with a long-term health condition while evaluating your vote in the 2026 general election means sorting through years of project shifts, budget updates, and construction milestones.

The new Dunedin Hospital project is split into two major components: the Outpatient Building (Whare Mātūtū) and the Inpatient (Acute Services) Building.


1. What is open and treating patients now?

  • The Outpatient Building: Officially marked as construction-complete and opened by the Government in late August 2026.
  • Patient Services Status: While the building is officially open, patient services are transitioning in phases. Some specialist clinics, day procedures, and radiology services are moving in gradually, with clinical services rolling out fully for patients starting in October 2026.
  • What it houses: Once fully transitioned, it handles ambulatory services, specialist outpatient clinics, planned radiology, day procedures/medical units, a transit care unit, and pathology.

2. What is still being built or moved?

  • The Inpatient (Acute Services) Building: This is the much larger core hospital building (situated on the former Cadbury factory site) which handles overnight beds, emergency care, and major surgical operations.
  • Current Construction Phase: Main structural works, steel framing, and base isolator installations for the Inpatient building are underway through mid-to-late 2026, with internal fit-outs scheduled to follow.

3. Expected dates for the different stages

  • October 2026: First wave of patients begins seeing specialists and using services inside the new Outpatient Building.
  • Early 2027: Final phased migration of remaining outpatient and ambulatory services from older facilities into the Outpatient Building is completed.
  • Late 2030 / Early 2031: Target for practical completion and full operational rollout of the massive Inpatient Building.

What this means for Otago and Southland patients

For day-to-day specialist appointments, blood tests, or radiology, relief is arriving right now with the opening of the Outpatient Building. However, the heavy-lifting elements of the project—acute beds, emergency department capacity, and major surgical wards housed in the Inpatient Building—remain years away from completion (targeted for 2030/2031).

As you weigh your vote, how heavily do you weigh the timeline and funding security of the remaining inpatient stage against other regional health priorities?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 5 October 2026 · shown as Gemini gave it, not a verified account

Google AI Mode · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

Here is the current breakdown of what is open, moving, and scheduled for the new Dunedin Hospital project (Project Whakatuputupu) as of October 2026.

What is Open and Treating Patients Now

  • Outpatient Building (Whare Mātūtū): The new 5-storey, 15,000-square-metre outpatient facility has recently reached its milestone opening phases—having been officially opened in August 2026 and rolling out public access around October 2026. [RNZ]

  • Current Status: While the building is officially open, full operational services and clinics are ramping up progressively, with complete transition of scheduled outpatient services moving through into early 2027. [RNZ]

  • Services delivering/transitioning here: Outpatient clinics, day procedures/day surgeries, co-located radiology (including X-ray, MRI, and CT scans), orthopaedics, ophthalmology, children's and women's health, and diagnostic services.

What is Still Being Built or Moved

  • Inpatient Building: The main inpatient and acute-services facility (which was subject to scaling-back decisions and budget recalibrations by the government) is still under construction.

  • Legacy Hospital Services: All acute, emergency, and inpatient hospital services continue to operate from the legacy Dunedin Hospital buildings on Great King Street while construction on the second stage proceeds. [Health New Zealand | Te Whatu Ora]

Expected Dates for Different Stages

  • Late 2026 – Early 2027: Phased transition and go-live of comprehensive services inside the new Outpatient Building (Whare Mātūtū), scaling up to full operational capacity for day procedures and outpatient appointments.

  • Late 2030: Scheduled practical completion of the main Inpatient Building.

  • 2031: The Inpatient Building is officially scheduled to open and begin receiving and treating inpatients.

You can track further official milestones directly via Health New Zealand | Te Whatu Ora - New Dunedin Hospital.

Would you like to explore specific specialist services or transport and parking access details for the new outpatient building to see how it affects your upcoming appointments?

Ask anything

Captured 5 October 2026 · shown as Google AI Mode gave it, not a verified account

Google AI Mode · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

As you navigate your healthcare needs in Dunedin and weigh your vote, here is the current breakdown of what is open, what is under construction, and the expected timelines for the New Dunedin Hospital project (Project Whakatuputupu).

1. What is Open and Treating Patients Now?

  • Outpatient Building (Whare Mātūtū): The brand-new, five-storey, 15,000-square-metre outpatient building on the former Cadbury site block is transitioning staff and opening for patient care. Following a public open day in September 2026, initial services are opening their doors to patients, though a complete rollout of all scheduled outpatient clinics across the building will phase in through early 2027.

  • What it delivers now/soon: Whare Mātūtū houses day procedures, general specialist outpatient clinics, four operating theatres, four procedure rooms, and upgraded radiology/medical imaging (including MRI, CT, and X-ray). It is projected to boost annual capacity by roughly 1,700 more day surgeries, 13,000+ imaging scans, and thousands of medical day-stay appointments.

  • Current Limitations: The existing older Dunedin Hospital campus remains fully operational for core acute needs. Services like the Emergency Department, primary inpatient wards, surgical theatres, BreastCare, and the New Zealand Artificial Limb service stay anchored at the legacy campus for now. [Health New Zealand | Te Whatu Ora]

2. What is Still Being Built or Moved?

  • Phased Outpatient Transitions: While the building is open, certain specialist clinics and diagnostic services are undergoing a staggered move from the old hospital and other sites, continuing through early 2027. [Health New Zealand | Te Whatu Ora]

  • The Inpatient Building (Stage Two): Construction is actively underway on the massive 11-storey acute/inpatient building across the road. This second major structure will house the heavy-duty hospital infrastructure, acute wards, and an overhead pedestrian and service bridge connecting back across St Andrew Street to the outpatient building.

3. Expected Stages and Timeline

  • Late 2026 – Early 2027: Ongoing staff transition and phased migration of remaining specialist outpatient, day-surgery, and diagnostic/radiology services into Whare Mātūtū.

  • 2025 – 2030/2031: Heavy construction, structural framing, interior fit-out, and clinical commissioning of the 11-storey inpatient building.

  • 2031: Scheduled opening of the main inpatient building, completing the core multi-year regional project. (Certain specialized or overflow services are planned to remain distributed or optimized across the broader campus framework).

You can track official service transition updates directly via Health New Zealand — New Dunedin Hospital Project.

Would you like to discuss how these phased moves might specifically affect your regular specialist clinics , or explore transport and parking access around the new outpatient building?

Ask anything

Captured 5 October 2026 · shown as Google AI Mode gave it, not a verified account

AI Overviews · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

AI Overview

As you consider your options ahead of the 2026 New Zealand general election , the status of Project Whakatuputupu (the New Dunedin Hospital) reflects a mixed timeline of immediate operational upgrades and long-term construction goals.

The primary breakthrough for patients with long-term conditions relies on separating planned appointments from acute emergency services. This prevents scheduled clinical appointments and day surgeries from being bumped or delayed due to sudden emergency department pressures.


1. What is Open and Treating Patients Now?

  • Outpatient Building (Whare Mātūtū): This five-storey, 15,000-square-metre facility was officially opened and blessed in August 2026. Final clinical testing and staff training wrapped up soon after, and the facility is scheduled to open to the public for patient care this month ,

October 2026

Add to calendar

. Community open day at New Dunedin Hospital Outpatient Building'Major milestone' as Dunedin Hospital outpatient building officially opens | RNZNew Dunedin Hospital Outpatient Building officially opened

  • Delivered Services: While transition schedules mean full capacity across all clinics will phase in through early 2027 , this building is where the majority of your specialist appointments will eventually take place. It handles:
  • Specialist clinics and consultation rooms.
  • Co-located planned radiology (including MRI, CT, X-ray, and ultrasound).
  • Day surgery and procedure units (featuring four operating theatres).
  • Modern digital integrations like self-check-in kiosks, digital wayfinding, and integrated shared electronic health records to streamline repetitive paperwork.

2. What is Still Being Built or Moved?

  • The Inpatient Building: This massive 11-storey, 72,000-square-metre structure on the former Cadbury site is currently a very active construction zone. It represents the largest single component of the build.

  • Current Construction Status: Major foundation and structural development are ongoing. Following the completion of the deep foundation pile capping, workers are executing substructure phases (forming basement and ground-floor slabs). Multiple tower cranes are actively operating on-site to lift and install the massive structural steel framework.

  • The Core Inpatient Relocation: All overnight stays, intensive care units (ICU), the main expanded emergency department (ED), and major complex surgeries will continue to take place at the existing Dunedin Hospital site (at 201 Great King Street) until the new inpatient facility is completed.


3. Project Delivery Timeline

Project Milestone Description & Phase Expected Completion Date
Outpatient Public Opening Whare Mātūtū welcomes first public patients. October 2026 Add to calendar
Outpatient Full Services Complete transition of all ambulatory and specialist clinic services. Early 2027 Add to calendar
Structural Framework Vertical structural steel rises to shape the 11-storey inpatient building framework. Ongoing through 2026/2027
Inpatient Completion Full opening of the acute inpatient building, featuring 351–404 beds and 22–24 operating theatres, linked via an overhead bridge. 2031 Add to calendar

If you want to investigate how political parties differ on this project ahead of your vote, I can summarize the Coalition Government's recent budget choices regarding the hospital's scale, or track the Opposition's alternative promises for Otago's clinical services. Would that help?

Ask anything

Captured 5 October 2026 · shown as AI Overviews gave it, not a verified account

AI Overviews · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

AI Overview

Managing a long-term condition requires certainty around your specialist care, making the timeline of Project Whakatuputupu (the New Dunedin Hospital) a crucial factor ahead of the election.

As of October 2026 , the new hospital project is entering a transition phase, split into two separate buildings. Below is exactly what is delivering care right now, what is still a construction zone, and the official targets.


🏥 What is Open and Treating Patients Now?

  • Outpatient Building ( Whare Mātūtū): This five-storey facility officially held its grand opening and mana whenua blessing in late August 2026. Following public open days in September, it begins treating its very first clinical patients this month (October 2026).

  • What it delivers for specialist care: It separates scheduled appointments from emergency chaos, reducing the risk of cancelled appointments. Once fully operational, it adds annual regional capacity for 1,700 more day surgeries , 13,000 more imaging scans (such as MRI, CT, and X-rays), and 2,700 more day-stay appointments.

  • Services currently moving or operating here: Specialized outpatient clinics, day procedures, radiology, children’s and women’s health, orthopaedics, and ophthalmology.

🏗️ What is Still Being Built or Moved?

  • The Migration Phase (Late 2026 – Early 2027): While the Outpatient Building is accepting patients this month, it is not yet at 100% capacity. Care teams and digital diagnostic systems are being progressively migrated from the old hospital site. Full, seamless operations across all outpatient services are expected to be locked in by early 2027.

  • Inpatient Building (Acute Services): This remains a major vertical construction site on the former Cadbury factory grounds. Foundations were finished late last year, and massive tower cranes were erected in mid-2026. The 11-storey structural steel skeleton is rising right now.

  • What stays at the old hospital for now: All emergency care, overnight acute hospital beds, intensive care (ICU), and major complex surgeries will continue to run entirely out of the existing Dunedin Hospital for the next several years.


🗓️ Expected Delivery Timeline

A direct comparison of the two sites highlights the multi-year gap between everyday specialist clinics and acute inpatient services:

Facility Stage Operational Target Key Features & Core Services Status
Outpatient Building ( Whare Mātūtū) October 2026 (Full move by Early 2027) 4 operating theatres, 4 procedure rooms, MRI/CT/X-ray radiology, specialist consultation spaces, and children's/women's health clinics. Opening to patients this month
Inpatient Building (Acute & Overnight Services) 2031 351 overnight beds (capacity for 404), 22 operating theatres, 58 Emergency Department spaces, and acute mental health beds. Under active vertical construction

Note: The final Inpatient Building timeline reflects a scaled-back scope finalized by the coalition government to keep the project on track.


To help look into how political parties are addressing regional healthcare, would you like information on each party's policy regarding health funding or local candidate debates happening in the Dunedin electorate?

Ask anything

Captured 5 October 2026 · shown as AI Overviews gave it, not a verified account