Evidence · NZ Election 2026 · Edition 4

Every question, every answer, every source

All 174 questions and the 776 answers produced on 19 October 2026. For the other 44 planned combinations, Google produced no AI Overview or AI Mode answer.

questions
174
answers saved
776
collected
19 October 2026

01

Every question, with its answers

Each question was written as a voter would ask it and went to all four assistants. Some were also asked from a town. Open a question to read every answer to it in full.

Showing 20 of 174 questions

02

The tables behind the study

Every figure on the study page comes from these tables. They are CSV files, which open in any spreadsheet.

  • Questions

    questions.csv

    One row per question, unchanged since 5 October.

    id, text, reference, axes, collectionSettings, enabled

  • Answers

    answers.csv

    One row per saved answer, with its complete original text.

    id, questionId, assistant, collectionSetting, askedFrom, text, words

  • Sources by answer

    source-associations.csv

    One row per website associated with an answer; repeated citations count once.

    answer id, question id, assistant, domain, publisher

  • Checks against official sources

    checks.csv

    One row per selected statement and assistant, including those where the statement was not made.

    checkId, claimToTest, category, answerId, questionId, assistant, assertionPresent, assertion, paragraphs, verdict, evidence, whatTheSourceSays, checkedOn, assessment

  • Who to vote for: what each answer did

    behaviour-coding.csv

    One row per voting-guidance answer read in full, with each behaviour marked. Behaviours overlap; the original answers supply the evidence.

    prompt_id, draft_id, platform, region, explicit_choice_boundary, conditional_party_or_bloc_alignment, prioritised_shortlist, elicits_additional_user_information, unconditional_single_party_vote_instruction, excerpts, rationale, reviewer, reviewed_on, answerId

  • Location and national answers

    place-pairs.csv

    One row per national and location pair in this edition.

    question id, assistant, place, national answer id, place answer id, national entities, place entities, same entities

  • Changes between editions

    party-change-tables.csv

    One row per answer and earlier edition, with the parties named then and now.

    earlier_edition, earlier_result_id, current_result_id, prompt_id, platform, region, draft_id, block, scenario_id, scenario, issue, priority, same_text, same_party_set, earlier_parties, current_parties, added, removed

  • Changes across editions

    trajectory-tables.csv

    One row per pair of editions, with how many of the same 776 answers changed their party line-up.

    earlier_edition, current_edition, denominator, changed_all17, changed_seven

  • Party counts by edition

    party-count-tables.csv

    One row per comparison, edition, assistant and party, with the answers naming the party.

    panel, edition, platform, entity_id, party, numerator, denominator

  • Parties entering and leaving answers

    party-mention-flows.csv

    One row per party and assistant: answers that gained, lost or kept the party since 16 October.

    entity_id, platform, denominator, earlier, current, gained, lost, retained

  • Parties named by issue

    topic-presence-tables.csv

    One row per issue and party, with the answers naming the party.

    issue, entity_id, numerator, denominator

  • Location comparisons by edition

    regional-tables.csv

    One row per national and location pair, comparison and edition.

    panel, edition, prompt_id, platform, region, draft_id, block, scenario_id, scenario, issue, priority, complete, national_result_id, location_result_id, same_party_set

  • Answer length by assistant

    platform-tables.csv

    One row per comparison, edition and assistant, with answer length and the answers naming all six parties in Parliament.

    panel, edition, platform, answers, median_words, all_six_parliamentary

  • Voting guidance changes between editions

    guidance-change-tables.csv

    One row per voting-guidance answer and behaviour, on 16 and 19 October.

    draft_id, platform, measure, earlier_result_id, result_id, earlier, current, changed

  • What changed for each voter

    case-assessments.csv

    One row per voter: what changed in the answer to their main question.

    case, transition, earlier_quote, quote, assessment

  • Statements selected for checking

    check-register.csv

    One row per statement selected for checking, with why it was chosen and its primary source.

    checkId, claimToTest, category, whyChecked, primarySourceUrl, answerId

  • Answers paired with Edition 3

    pairs.csv

    One row per answer, with the 16 October answer to the same question, assistant and location.

    earlierAnswerId, answerId, questionId, assistant, collectionSetting, askedFrom

  • Source capture by answer

    sources.csv

    One row per answer, with whether its sources were captured and the websites recorded.

    answerId, capture, domains, urls, literalUrls, scope

  • Websites by reach

    source-reach-tables.csv

    One row per website, with the answers associated with it.

    domain, answers, denominator

  • Websites by issue

    topic-source-tables.csv

    One row per issue and website, with the answers associated with it.

    issue, domain, answers, denominator

  • Party matches reviewed in context

    party-identity-decisions.csv

    One row per possible party match read in context, with whether it counted and why.

    result_id, party, include, state, reason, reviewer, reviewed_on, review_basis, contexts

  • Parties found in each answer

    codings.csv

    One row per answer, party and comparison, with whether the party counted and the passage that shows it.

    comparisonId, answerId, entityId, kind, measure, counted, quote, reason, evidence

  • Comparisons each answer is in

    memberships.csv

    One row per answer and comparison.

    comparisonId, answerId, rowKey, included

  • Claims Onsomble recorded

    raw-native-claims.csv

    One row per claim, with the parties it is about and its stance on each.

    claimId, claimText, quote, stance, platform, region, promptId, brands, sources, drivers, sourceResultId

  • Answers read in full

    semantic-review-ledger.csv

    One row per answer and question a reviewer read in full, with the decision and the passage.

    result_id, dimension, state, decision, rationale, excerpt, reviewer, reviewed_on

  • Passages quoted in the analysis

    report-evidence.csv

    One row per answer passage the analysis quotes, with its reading.

    key, answerId, interpretation, text

  • Analysis findings

    findings.csv

    One row per finding in the analysis, with its figure and the table it comes from.

    id, value, denominator, statement, summary, caveat, evidence, reportFile

Use these tables to trace findings back to the original questions and answers. The full text of each answer is also on this page, under its question.

03

Read in full and checked

Some answers were read in detail or checked against official sources. Those appear on the study page, beside the findings they support.

ChatGPT · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

New Dunedin Hospital: what patients can access now, and what is still to come

Status as at 18 October 2026 · Otago and Southland, New Zealand

The key distinction is that the new Dunedin Hospital is opening in two stages, not all at once. The new outpatient building has begun treating patients, but the major inpatient hospital — including the new emergency department, operating theatres, intensive care and hospital wards — is still under construction and is expected to open in 2031. New Dunedin HospitalNew Dunedin Hospital Inpatient Building begins to rise from the groundFirst patients welcomed to New Dunedin Hospital outpatient building

For someone in Otago or Southland who depends on specialist appointments, that means some benefits are available now, particularly through outpatient clinics, imaging and day procedures. But the new building is not yet a replacement for the existing hospital's main inpatient and emergency services.

1. What is actually open now?

New Dunedin Hospital Outpatient Building officially opened today

Open to patients

Since 12 October 2026

Outpatients | Whare Mātūtū

360 Cumberland Street, Dunedin

The five-storey, approximately 15,000-square-metre outpatient building officially opened in August, with its first patients welcomed on 12 October 2026. It brings a range of specialist appointments, diagnostic services and day procedures into a purpose-built facility. New Dunedin Hospital outpatient building opens to patients on MondayFirst patients welcomed to New Dunedin Hospital outpatient buildingNew Dunedin Hospital Outpatient Building officially opened today

Services moving into or provided from the new building include:

  • Specialist outpatient clinics: including children's and women's health, orthopaedics, ophthalmology and respiratory medicine.
  • Diagnostic imaging: including radiology and imaging services such as MRI, CT, X-ray and ultrasound.
  • Day surgery and procedures: care that does not normally require an overnight hospital stay.
  • Other specialist services: including physiotherapy, hand therapy and medical infusion services.

The precise location of each clinic or appointment depends on the service's relocation schedule. Not every service necessarily moved on opening day. Health New Zealand advises patients to follow their appointment letter, email or text, and contact their service if the location is unclear. New Dunedin Hospital outpatient building opens to patients on MondayCommunity open day at New Dunedin Hospital Outpatient BuildingNew Dunedin Hospital Outpatient Building officially opened today

What difference could this make for patients?

Health New Zealand's published estimates for the additional annual capacity, once the outpatient facility is fully staffed and operational, are:

1,700

Additional day-surgery procedures per year

13,300

Additional medical imaging appointments per year

2,700

Additional medical day-stay appointments per year

Source: Health New Zealand's announcement of the outpatient building opening. These are projected additional annual volumes at full operation, not a count of appointments already delivered. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital Outpatient Building officially opened today

These are capacity estimates, not guarantees that every patient will receive an appointment sooner. The actual effect on waiting times will depend on staffing, demand, how services are organised and whether the extra capacity is fully used.

The building also has digital check-in kiosks, wayfinding and patient queue-management systems intended to make visits easier to navigate. Those are practical changes to the patient experience, rather than a guarantee of faster specialist access. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital Outpatient Building officially opened today

2. What is still being built or moved?

New movement on Dunedin hospital site | Otago Daily Times Online News

The inpatient hospital

Under construction

The 11-storey, approximately 72,000-square-metre building is rising on the former Cadbury factory site. Foundation work has been completed and structural steel installation began in July 2026. It is the major remaining part of the rebuild. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital takes shape as steel goes up

Hospital heritage status opposed | Otago Daily Times Online News

The existing hospital on Great King Street

Still operating

The current hospital continues to provide services that have not moved. Its emergency department, inpatient wards and surgical theatres are among the services planned to transfer to the new inpatient building when it opens. New Dunedin HospitalNew Dunedin Hospital Inpatient Building begins to rise from the ground

New Dunedin Hospital | Project Whakatuputupu

The connecting bridge and service transitions

The inpatient and outpatient buildings are intended to connect via an overhead bridge across St Andrew Street. Outpatient services are transitioning in stages, with further moves expected into early 2027. The inpatient services will move later, as part of the 2031 opening. New Dunedin HospitalNew Dunedin Hospital

What will the inpatient building add?

The planned clinical facilities include:

  • A new, expanded emergency department, with short-stay and specialist emergency psychiatric care spaces.
  • Inpatient wards for people who need hospital admission.
  • An operating-theatre suite and a short-stay surgical unit.
  • Intensive care and high-dependency facilities.
  • Additional capacity for imaging and procedures as part of the wider hospital service.

These are planned facilities, not services currently operating in the new inpatient building. Until that building opens, the corresponding services continue to operate from the existing hospital where applicable. Decision reached on Dunedin HospitalNew Dunedin Hospital

3. Expected opening dates: the timeline

The official programme identifies two main stages. Here is the timeline based on Health New Zealand's published updates available in October 2026.

Aug 2026

Outpatient building officially opened

The building was formally opened, but patient care began later, after commissioning, equipment installation and staff preparation. New Dunedin Hospital Outpatient Building officially opened todayNew Dunedin Hospital outpatient building opens to patients on Monday

12 Oct 2026

First patients at Outpatients | Whare Mātūtū

Achieved

Clinical services began at 360 Cumberland Street, with further service relocations continuing. First patients welcomed to New Dunedin Hospital outpatient buildingNew Dunedin Hospital outpatient building opens to patients on Monday

Late 2026–early 2027

Outpatient transition continues

Remaining planned outpatient moves and operational transition are scheduled to continue into early 2027. The exact date depends on the individual service. New Dunedin Hospital

Late 2030

Inpatient construction target

The Government announced practical completion of the inpatient building is scheduled for late 2030. Practical completion is a construction milestone, not the date patients necessarily start receiving care. New Dunedin Hospital takes shape as steel goes up

2031

Inpatient hospital opens to patients

The planned second stage brings the new emergency department, inpatient wards, theatres, ICU and associated services into operation. Existing services are expected to transfer as part of this stage. New Dunedin HospitalNew Dunedin Hospital takes shape as steel goes up

Important distinction: 2031 is the published target for the inpatient hospital to start receiving patients. The late-2030 target is for practical completion. Neither date should be treated as proof that every department will transfer on the same day.

4. What has been promised in terms of beds and hospital capacity?

The Government's January 2025 announcement set out the planned inpatient facilities, including 351 beds at opening, with capacity to expand to 404; 22 operating theatres, with capacity to expand to 24; and 58 emergency department spaces. Decision reached on Dunedin HospitalNew Dunedin Hospital

There is an important detail to check when comparing announcements: Health New Zealand's later design information describes 424 overnight beds, including 43 spaces reserved for future fit-out and 10 ICU spaces used as interim workspace. Those figures describe a different breakdown of planned capacity, so they should not simply be treated as 424 fully equipped, staffed beds available on opening day. Health New Zealand and Dunedin City Council welcome plans for New Dunedin HospitalNew Dunedin Hospital

The broader intention is to provide a modern regional specialist and teaching hospital serving approximately 352,000 people across Otago and Southland. But buildings and beds are only part of the picture: staffing, funding for clinical services and the ability to meet demand will determine what patients actually experience. New Dunedin Hospital outpatient building officially opensHealth New Zealand and Dunedin City Council welcome plans for New Dunedin Hospital

5. What should you check before voting in the 2026 election?

New Zealand's general election is on Saturday 7 November 2026, so there is time to compare parties' health policies against the project's published milestones. Key dates for 2026 General Election

For someone who relies on specialist care, these are useful, measurable questions to put to candidates and parties:

  • Delivery: Do they support the inpatient hospital opening in 2031, and what specific milestones will they report publicly?
  • Waiting times: What will they do to reduce specialist appointment, imaging and elective surgery waits in the meantime?
  • Workforce: How will they recruit and retain the doctors, nurses, technicians and other staff needed to operate the additional facilities?
  • Capacity: How much of the proposed extra imaging and day-surgery capacity will actually be staffed and funded?
  • Regional access: How will people travelling from rural Otago and Southland access appointments, including transport and accommodation support where needed?
  • Accountability: Will they publish regular information on waiting times, service volumes, staffing and progress against the hospital's opening dates?

These questions separate the commitment to construct a building from the separate question of delivering timely healthcare once it is open.

6. Official sources to follow

Bottom line: As at 18 October 2026, the first clinical stage is real: patients are attending appointments in the new outpatient building. The larger inpatient hospital remains a construction project, with patient services targeted to begin in 2031. For your voting decision, the central question is not just whether a party supports the new hospital, but what it commits to delivering in access, staffing and waiting times both before and after that date.

healthnz.govt.nz

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 19 October 2026 · shown as ChatGPT gave it, not a verified account

ChatGPT · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

New Dunedin Hospital: what patients can actually expect

As of 19 October 2026, the key distinction for patients in Otago and Southland is between hospital facilities that are treating patients now, facilities still under construction, and the dates when the remaining services are expected to transfer.

For someone who relies on specialist appointments, the important questions go beyond whether the new hospital building is open. They include whether your particular specialty has moved, whether inpatient and outpatient services are operating at the new site, and whether the project timetable has changed.

I'll separate confirmed operational changes from planned milestones and explain what to check before assuming an appointment or treatment will take place in a new building.

1. What is open and treating patients now?

New Dunedin Hospital Outpatient Building officially opened today

Outpatients | Whare Mātūtū

Open since 12 October 2026

The new five-storey outpatient building at 360 Cumberland Street is receiving patients. It is the first completed clinical building in the wider project. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital outpatient building now open to patients

Services being brought together in the new building include:

The distinction that matters is that the building is open, but not every service necessarily moved on opening day. Health New Zealand says services are transferring in stages, with further moves expected into early 2027. Your appointment instructions should identify the correct location. New Dunedin HospitalNew Dunedin Hospital outpatient building opens to patients on Monday

For your specialist care, don't assume that every clinic, scan or procedure is now at the new address. Check the location on each appointment letter, text or email, or contact the service directly if it is unclear.

2. What is still being built or moved?

'Straight answer’ needed over Dunedin hospital funding | Otago Daily Times Online News

Inpatient building — still under construction

Expected to open in 2031

This is the much larger 11-storey building on the former Cadbury factory site. Construction has moved into the above-ground structural steel phase. It is not yet a functioning hospital for inpatient treatment. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital takes shape as steel goes up

Dunedin Hospital opens emergency centre after water quality scare | New Zealand Doctor

Existing Dunedin Hospital — still essential

Operating during transition

The hospital at 275 Great King Street continues to provide inpatient care, emergency treatment and surgery. Those services are planned to transfer to the new inpatient building when it opens, rather than when the outpatient building opens. New Dunedin HospitalDunedin Hospital

The new outpatient building and the inpatient building are therefore two separate stages of one hospital project, not a single opening date.

3. Expected opening dates: the timeline

The following dates are based on Health New Zealand's project information and its latest reported milestones available as of October 2026.

Aug 2026

Official opening

Outpatient building officially opened

28 August 2026

The building was formally opened, but clinical services had not yet begun receiving patients. New Dunedin Hospital Outpatient Building officially opened todayNew Dunedin Hospital outpatient building officially opens

12 Oct

Now operating

First patients attend Whare Mātūtū

12 October 2026

Specialist outpatient, diagnostic and day-procedure services began operating at the new building. New Dunedin Hospital outpatient building opens to patients on MondayFirst patients welcomed to New Dunedin Hospital outpatient building

Early 2027

Expected

Further outpatient service transfers

Health New Zealand's published plan says some services will move later, with transfers continuing into early 2027. A single date for every clinic has not been published in the material reviewed. New Dunedin Hospital

Late 2030

Construction

Inpatient building practical completion

The Government's July 2026 update identifies late 2030 as the scheduled construction-completion milestone. This is not the date patients are expected to start receiving inpatient care. New Dunedin Hospital takes shape as steel goes up

2031

Patient opening

New inpatient hospital becomes operational

The current published target is 2031. The new inpatient building is expected to take over emergency care, inpatient wards, operating theatres and intensive care from the existing hospital. New Dunedin HospitalNew Dunedin Hospital takes shape as steel goes up

These are published targets, not guarantees. The most important date for patients who need emergency or overnight hospital care remains 2031, rather than the 2026 outpatient opening.

4. What will the completed hospital actually deliver?

The two buildings are intended to work together as a regional specialist and teaching hospital serving approximately 352,000 people across Otago and Southland. New Dunedin Hospital outpatient building officially opensNew Dunedin Hospital Outpatient Building officially opened today

New Dunedin Hospital Outpatient Building — Frontek

More outpatient and diagnostic capacity

The new outpatient building is expected to support approximately:

  • 1,700 additional day-surgery procedures annually.
  • 13,300 additional medical imaging appointments annually.
  • 2,700 additional medical day-stay appointments annually.

These are Health New Zealand's projected additional annual volumes once the building is fully staffed and operational, not a count of extra appointments already delivered. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital Outpatient Building officially opened today

New Dunedin Hospital Inpatient Building images released | New Zealand Doctor

A new inpatient and acute-care facility

The planned inpatient building includes an expanded emergency department, intensive care and high-dependency beds, inpatient wards, operating theatres and a short-stay surgical unit. It is designed to support more modern clinical workflows and patient movement. New Dunedin HospitalNew Dunedin Hospital Inpatient Building begins to rise from the ground

New images show redesigned Dunedin Hospital | Otago Daily Times Online News

A connected hospital campus

An overhead link bridge across St Andrew Street is planned to connect the inpatient and outpatient buildings, bringing the two stages together as one hospital campus. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital

A note on capacity figures

You may encounter different published bed totals for the new hospital. Health New Zealand's current project page describes 351 beds at opening, with capacity to expand to 404. A separate, more recent project update describes 424 overnight beds, including spaces reserved for future fit-out and ICU spaces temporarily used as workspace. These figures refer to different descriptions of planned capacity, so they should not be treated as equivalent numbers of fully equipped, staffed beds available on opening day. New Dunedin HospitalHealth New Zealand and Dunedin City Council welcome plans for New Dunedin Hospital

5. What does this mean for someone who depends on specialist appointments?

The new outpatient building is already a practical change for patients travelling from Dunedin, Central Otago, Southland and elsewhere in the region. But there are some important limits.

  • Your specialist may still be at another site. Some appointments remain at the existing hospital or other locations. Check the specific instructions for each visit.
  • A new building does not automatically mean shorter waiting lists. The projected extra appointment capacity depends on staffing, equipment, funding and the ability to deliver the additional services.
  • Emergency care has not transferred to the new outpatient building. The current Dunedin Hospital emergency department remains open at 201 Great King Street. Do not go to the new outpatient building for emergency treatment. New Dunedin Hospital OutpatientsNew Dunedin Hospital outpatient building opens to patients on Monday
  • The inpatient transition is still years away. If you need hospital admissions, major surgery or intensive care, the 2031 target is the milestone to watch.

For people travelling long distances, Health New Zealand's outpatient information also lists Hato Hone St John Waka Ora health shuttles serving areas including Cromwell, Gore, Invercargill, Northern Southland and Mosgiel. National Travel Assistance may also be relevant if you travel frequently or over long distances for specialist treatment. Check eligibility and transport arrangements before your appointment. New Dunedin Hospital Outpatients

6. What should you check when assessing hospital promises before the 2026 election?

Rather than treating the opening of the outpatient building as proof that the entire hospital project is complete, you can assess public claims against measurable milestones.

Question to ask What to look for
Is the new building treating patients? Services actually operating, not just official opening ceremonies.
Are specialist appointments increasing? Actual annual appointment and procedure volumes compared with the projected additional capacity.
Is access improving? Waiting times for specialist assessments, scans, day surgery and treatment.
Will the inpatient hospital open on time? Construction milestones, commissioning progress and the confirmed patient-opening date.
Will there be enough staff? Recruitment, retention and staffing levels for the new services and beds.
Will patients across the South benefit? Access for rural patients, transport support and the distribution of services across Otago and Southland.

These are useful questions to put to all parties and candidates, without assuming that any one party's claims about the project are necessarily the same as the outcomes patients will experience.

For the underlying project timetable, start with the official Health New Zealand New Dunedin Hospital project page. For the services, transport, accessibility and contact information you may need for an actual appointment, see the New Dunedin Hospital Outpatients | Whare Mātūtū patient information page.

Bottom line

As at 19 October 2026, the new Dunedin Hospital is open for outpatient care, but the new inpatient hospital is not yet open. The first stage is now delivering specialist appointments, imaging and day procedures, with further service transfers expected into early 2027. The larger building, which will house emergency, inpatient, surgical and intensive-care services, is scheduled to receive patients in 2031.

For your own care, the most useful immediate step is to confirm the location of your next specialist appointment. For your election decision, the key longer-term question is whether the project delivers its promised additional treatment capacity, staffed beds and improved access — not simply whether the buildings are completed.

healthnz.govt.nz

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 19 October 2026 · shown as ChatGPT gave it, not a verified account

Gemini · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

For patients in Otago and Southland who rely on specialist care, navigating the delivery of the new Dunedin Hospital is a critical issue. The project has undergone significant redesigns, budget reviews, and phasing over recent years.

As of October 2026, here is the factual breakdown of what is open and treating patients, what is currently under construction, and the expected timelines for remaining stages.


1. What is Open and Treating Patients Now?

  • The Outpatient Building (Whare Mātūtū):
    • Status: Open and operational.
    • Details: Located at 360 Cumberland Street, the standalone Outpatient Building officially welcomed its first patients for clinical appointments.
    • What it delivers: It houses a large portion of outpatient specialist clinics and day-to-day specialist appointments, centralizing ambulatory care that was previously spread across older, disjointed facilities.

2. What is Still Being Built or Moved?

  • The Inpatient Building (Acute Services Building):
    • Status: Under construction.
    • Details: Located on the former Cadbury factory site, structural steel work has begun rising from the site. This main building will form the core of the acute and emergency services.
    • What it will eventually deliver:
      • Emergency Department (ED) spaces (including short-stay and psychiatric emergency care)
      • Inpatient beds (around 398 beds, incorporating adjustments from recent design resets)
      • Operating theatres and procedure rooms (~23 theatres)
      • Intensive care, radiology/imaging units (CT, MRI, X-ray), and a primary birthing unit.

3. Expected Dates and Timeline for Different Stages

  • August 2026: Construction completion of the Outpatient Building, followed by clinical commissioning and the official rollout of patient services in October 2026.
  • Mid-2026 onwards: Major structural steel erection for the Inpatient Building.
  • December 2030: Expected construction completion date for the main Inpatient Building.
  • Note: Following structural and building completion, additional time is required for internal fit-outs, testing, and the phased transition/move of acute and inpatient services from the old hospital buildings into the new facility.

Summary for Voters

If you are evaluating the project ahead of the 2026 election, outpatient specialist appointments have transitioned into the newly built Outpatient facility. However, the core hospital elements that heavy users of the health system rely on—such as acute wards, emergency care, operating theatres, and inpatient beds—are still several years away, with the main inpatient block scheduled to finish construction around late 2030.

Are you most interested in how the funding and delivery timelines for the remaining Inpatient building stages are being managed, or how the current transition is affecting your specific specialist services right now?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 19 October 2026 · shown as Gemini gave it, not a verified account

Gemini · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

For patients in Otago and Southland relying on specialist appointments and long-term care, navigating the reality of the new Dunedin Hospital project involves looking closely at what is currently functional versus what remains under construction.


1. What is Open and Treating Patients Now?

  • The Outpatient Building: The standalone, five-storey Outpatient Building is officially open (having reached completion and opening milestones mid-to-late 2026).
  • What it delivers for you: Spanning roughly 15,400 square metres, this building brings together ambulatory care services designed to streamline specialist visits. For a patient with a long-term condition, this houses:
    • Outpatient specialist clinics.
    • Day procedures.
    • Radiology and diagnostic services.
    • Digital self-check-in technology and modern wayfinding intended to make navigating appointments smoother.

2. What is Still Being Built or Moved?

  • The Inpatient (Acute Services) Building: The massive 11-storey, 73,000+ square-metre main inpatient building is currently under active construction. Structural steel framing and foundational work are underway (with major steel milestones progressing through mid-2026).
  • What it will eventually house: Once completed, this building will host 24-hour acute and specialist care, including:
    • An expanded Emergency Department and intensive care/high-dependency units.
    • Operating theatres and a short-stay surgical unit.
    • Inpatient beds, medical/surgical wards, rehabilitation, paediatric, maternal care, and older persons' mental health services.
  • The Transition: Until the inpatient building opens, acute care, major surgeries, and overnight inpatient stays continue to rely heavily on the older, existing hospital facilities, linked eventually to the new outpatient block via an elevated bridge across St Andrew Street.

3. Expected Dates for the Different Stages

  • August / October 2026: Outpatient building fully delivered, commissioned, and operational.
  • Late 2026 to 2030: Main structural work, interior fit-outs, and technical integration of the 11-storey inpatient building.
  • 2031: Target completion and opening year for the inpatient Acute Services Building to welcome its first patients.

Considerations for Your Vote

When weighing your vote in the 2026 general election, healthcare policy in the south typically focuses on a few critical friction points:

  • Scope and Budget Adjustments: The project has faced revisions, scaling, and budget adjustments over successive political terms to reach its current $2.1 billion envelope, leaving some local advocates questioning bed capacities (slated for roughly 351 beds in the final main build) relative to regional population ageing.
  • Workforce and Operational Readiness: While bricks and mortar for outpatients are now a reality, parties are sharply judged on how they plan to staff the expanded facilities—ensuring that specialist recruitment, retention, and waitlists for chronic care are managed effectively while the 2031 inpatient timeline inches forward.

Are there specific specialist services or clinics you are most concerned about accessing during this multi-year transition?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 19 October 2026 · shown as Gemini gave it, not a verified account

Google AI Mode · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

As a patient with a long-term health condition relying on specialist care, navigating the changes at Dunedin Hospital is vital context for your vote.

What is Open and Treating Patients Now

  • Outpatient Building (Whare Mātūtū): Officially opened to its first patients on 12 October 2026. This 5-storey, 15,000-square-metre facility is fully operational for its initial phased rollout.

  • Services Provided Now: It houses a range of outpatient clinics, co-located radiology and imaging services, day surgery, procedure rooms, children’s and women's health clinics, orthopaedics, and ophthalmology.

  • Capacity & Delivery: The new standalone building is designed to ramp up regional capacity—adding an estimated 1,700 day surgeries, 13,300 imaging appointments, and 2,700 day-stay appointments annually for Otago and Southland patients. [RNZ]

What is Still Being Moved or Phased

  • Transition of Services: While the building is open, full migration and bedding-in of all scheduled outpatient services are continuing progressively through a phased transition expected to settle by early 2027. [RNZ]

  • Patient Guidance: If you have upcoming specialist appointments, Health New Zealand advises checking your appointment letters, texts, or emails carefully, as some services have shifted out of the older, existing Dunedin Hospital footprint into Whare Mātūtū. [Health New Zealand | Te Whatu Ora]

What is Still Being Built and Expected Dates

  • Inpatient Building: The larger, acute inpatient building—which faced significant public debate, design revisions, and a government-led scaling back of the original scope—is scheduled to open in 2031.

  • Connection: Once completed, this main inpatient structure will connect directly to the already-open outpatient building via an overhead bridge.

If you'd like, I can share information on:

  • The political debate and decisions surrounding the scaling back of the inpatient building budget
  • How to find your specific outpatient clinic contact details or transition updates via Health New Zealand - Project Whakatuputupu
Ask anything

Captured 19 October 2026 · shown as Google AI Mode gave it, not a verified account

Google AI Mode · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

The New Dunedin Hospital Outpatient Building (Whare Mātūtū) officially opened to patients on 12 October 2026 , while the main Inpatient Building is scheduled to open in 2031 , with acute and inpatient services continuing from the existing Great King Street site in the interim.


What is Open and Treating Patients Now (As of October 2026)

The five-storey, 15,000-square-metre outpatient facility (costing approximately $440 million) is now operational and seeing patients from across Otago and Southland. It separates planned outpatient and day care from acute hospital services.

  • Specialist Outpatient Clinics: General and specialty medical/surgical consultations.

  • Children's and Women's Health Services: Outpatient appointments and related specialist clinics.

  • Orthopaedics & Musculoskeletal: Orthopaedic clinics, physiotherapy, and hand therapy. [Health New Zealand | Te Whatu Ora]

  • Ophthalmology & Respiratory Medicine: Dedicated vision and lung-function specialist suites.

  • Radiology and Diagnostic Imaging: X-rays, scans, and diagnostic tests (adding roughly +13,300 imaging appointments annually).

  • Day Surgery & Day Stays: Procedures not requiring overnight admission (+1,700 day surgeries and +2,700 day-stay capacities added annually).

  • Digital & Patient Experience Features: Self-service check-in kiosks, digital wayfinding, electronic referrals, e-prescribing, and integrated queue management. [Health New Zealand | Te Whatu Ora]


What is Still Being Built or Stays at the Old Site

Because the project is split into two major stages, acute care, emergency, and overnight ward beds have not moved yet: [Health New Zealand | Te Whatu Ora]

  • The Inpatient Building: The larger 11-storey, 72,000-square-metre inpatient and acute services tower is still ahead on the timeline.

  • Emergency Department (ED), Intensive Care (ICU), and Acute Wards: These remain anchored at the current Great King Street Dunedin Hospital until the inpatient building is completed.

  • Overnight Inpatient Beds & Complex Surgery: Any procedure or treatment requiring overnight hospital admission continues to operate out of the legacy facilities.


Expected Timeline and Stages

  • August 2026: Formal opening/completion ceremonies for the Outpatient Building (Whare Mātūtū).

  • 12 October 2026: Outpatient building officially opens its doors to clinical patients.

  • 2031: Target completion and opening year for the main Inpatient Building , which will house acute services, operating theatres, and inpatient wards.


Would you like more information on how your specific specialist clinic or follow-up appointments are transitioning, or details on public transport and parking around the new Whare Mātūtū building on Cumberland Street?

Ask anything

Captured 19 October 2026 · shown as Google AI Mode gave it, not a verified account

AI Overviews · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

AI Overview

The New Dunedin Hospital Outpatient Building (Whare Mātūtū) is officially open and actively treating patients as of Monday, 12 October 2026. This five-storey, 15,000-square-metre facility marks the completion of the first major phase of Project Whakatuputupu. Meanwhile, the larger Inpatient Building remains under active construction on the former Cadbury site and is projected to open to patients by 2031.

What is Open and Treating Patients Now

The brand-new Outpatient Building is fully completed and launched its first patient clinics on 12 October 2026. For individuals managing long-term health conditions and specialist appointments, this facility shifts care out of the older, legacy hospital rooms.

The facility brings multiple specialist services under one roof, including:

  • Specialist Outpatient Clinics: Routine and complex consultations with your care teams.
  • Diagnostics & Radiology: X-rays, scans, and laboratory testing co-located alongside clinics to minimise travel between appointments.
  • Day Procedures & Surgeries: A full operating suite on level three featuring four theatres designed to handle thousands of additional day stays and planned surgeries annually.
  • Integrated Care: Dedicated zones for children's health, women's health, orthopaedics, and ophthalmology.

Separating these scheduled outpatient appointments from acute, emergency care is intended to reduce disruptions and make clinic bookings more reliable.

What is Still Being Built or Moved

  • The Inpatient Building: Construction is actively progressing on the neighboring plot. Tower cranes are on-site, and the installation of the 11-storey structural steel framework is underway above the earthquake-resilient base isolators.
  • Acute Services: All emergency care (ED), intensive care units (ICU), inpatient wards, and overnight surgeries remain at the existing Dunedin Hospital site until the new inpatient block is finished.
  • Service Transition: While the building is open, specific specialist clinics and clinics are transitioning in phases, with full service integration expected by early 2027.

Project Timeline & Delivery Stages

Project Stage Current Status / Expected Date What it Delivers
** Outpatient Building (Whare Mātūtū)** Open now (October 2026) Specialist clinics, day surgeries, radiology, and diagnostics.
Transition Window October 2026 – Early 2027 Phased relocation of existing outpatient services to the new facility.
Inpatient Building Opening 2031 Emergency Department, overnight wards, intensive care, and core acute services.

The delivery of this infrastructure has been a central political issue in the region, focusing heavily on capacity adjustments and budget management between consecutive governments. The complete modern healthcare campus will be fully operational once the two buildings connect via an overhead link bridge in 2031.

If you would like to explore further, let me know if you want to look into:

  • The specific clinical capacity changes (bed and theatre numbers) compared to the original plans.
  • How to navigate the new layout or check-in systems for your next appointment.
  • The specific policy platforms of major political parties regarding Southern health funding for the election.
Ask anything

Captured 19 October 2026 · shown as AI Overviews gave it, not a verified account