Evidence · Home lending

The questions and original answers

Explore every question and captured response in the home-lending study, including answers asked nationally and from four cities.

questions
193
captured answers
1,094
AI platforms
4
collected
11 October 2026

01

Every question, with its answers

Each question was written as a voter would ask it and went to all four assistants. Some were also asked from a town. Open a question to read every answer to it in full.

Showing 20 of 193 questions

02

The tables behind the study

Every figure on the study page comes from these tables. They are CSV files, which open in any spreadsheet.

  • Question catalogue

    questions.csv

    One row per question.

    Question ID, borrower, exact question, group and collected answers

  • Answers

    answers.csv

    One row per answer, with its full text.

    Answer ID, question ID, borrower, assistant, city, words, coded recommendations, showed a link and full text

  • Sources by answer

    sources.csv

    One row for each website recorded as a source of an answer.

    Answer ID, question ID, assistant, city, website and publisher type

  • Checks against official sources

    checks.csv

    One row per statement checked.

    Check, answer ID, assistant, what the answer said, verdict, what the source says, source and date

  • Recommendation coding

    recommendation-coding.csv

    One row per coded national loan-choice or support answer.

    Answer ID, question ID, borrower, assistant, question group, recommended lenders and supporting passages

  • Platform comparisons

    platform-recommendation-counts.csv

    One row per platform, lender and question group.

    Matched panel, recommended answers, denominator and supporting answer IDs

  • City comparisons

    city-recommendation-counts.csv

    One row per city, lender and question group.

    Matched panel, recommended answers, denominator and supporting answer IDs

Use these tables to trace findings back to the original questions and answers. The full text of each answer is also on this page, under its question.

03

Read in full and checked

Some answers were read in detail or checked against official sources. Those appear on the study page, beside the findings they support.

ChatGPT · National

We own land and are getting ready to apply for a home-build loan. What documents will the lender want from us and the builder?

If you already own the land in New Zealand, you’re generally applying for a construction loan (or build loan). The lender will want to establish three things: that you can afford the borrowing, that the land and proposed home provide adequate security, and that the build can be completed within the approved budget.

The good news is that you can prepare much of the paperwork before you formally apply. The exact requirements vary between banks and depend on whether you’re using a fixed-price contract, a cost-plus arrangement, or managing parts of the build yourselves. Borrowing to build | Home loansConstruction loans - Buying land and building a housePlanning your building or renovation project

1. Documents you’ll need to provide

Your financial documents

  • Recent payslips and employment details, or financial statements and tax returns if self-employed.
  • Bank statements showing income, savings and day-to-day spending.
  • Details of existing mortgages, personal loans, credit cards, hire purchases and other debts.
  • Evidence of your cash contribution or savings available for the build.
  • Details of other income, such as rental income, if applicable.

The lender may request additional documents to verify your income, living expenses and ability to service the proposed loan.

Documents for your existing land

  • Certificate of title or other evidence of ownership.
  • Details of any existing mortgage registered against the land.
  • A registered valuation, if requested, showing the land's current value and potentially the estimated value of the completed home.
  • Information about access, services and site conditions if relevant to the project.

If you own the land outright, its accepted value may contribute to your equity in the project. If there is an existing mortgage, the bank will need to account for that debt.

Your proposed build

  • Architectural drawings and detailed plans.
  • Full specifications covering materials, fixtures, fittings and finishes.
  • A detailed builder's quote and total project budget.
  • Estimates for items outside the builder's contract, such as earthworks, driveway, landscaping, fencing, utility connections and council fees.
  • A realistic construction timeline.

The lender needs to understand the total cost of getting the home finished and liveable, not just the headline price quoted by the builder. Building a Home - Flexible Loans & Low DepositsPlanning your building or renovation project

2. Documents your builder will need to supply

This is often the most important part of a build-loan application. Ask your builder to prepare the following package.

  1. Signed building contract

Ideally, a detailed fixed-price contract, where suitable, that sets out:

  • Total price, including GST.
  • Full scope of work and inclusions/exclusions.
  • Start and estimated completion dates.
  • Payment milestones and progress-payment schedule.
  • How variations, unexpected costs and delays are handled.
  1. Itemised quote and construction budget

This should show the cost of the work and identify any exclusions, provisional sums or allowances. The lender may also want a contingency allowance for cost overruns.

  1. Building and resource consents

Copies of the approved building consent and any required resource consent, or evidence of the application status if the bank allows conditional approval before these are granted.

  1. Builder details and insurance
  • Builder's legal business name and contact details.
  • Relevant qualifications and Licensed Building Practitioner (LBP) details, where applicable.
  • Confirmation of contract works insurance and any other insurance the lender requires.
  • Details of any building guarantee or warranty, such as a Master Build Guarantee if applicable.
  1. Progress-payment schedule

A schedule showing when payments fall due and what stage of construction each payment covers. The lender uses this to plan the release of funds during the build.

These requirements are consistent with the published guidance from Kiwibank and ANZ. Borrowing to build | Home loansStarting your building or renovation projectPlanning your building or renovation project

One important point: for residential building work costing NZ$30,000 or more (including GST), the builder must provide you with a written contract, a disclosure statement and the standard consumer protection checklist before you sign. These are useful documents to have on file, even if the bank does not request every one individually. Homeowner rights and obligationsBefore building work starts

3. What the bank may require before releasing funds

Initial approval and permission to draw down the construction loan are not necessarily the same thing.

Stage Documents commonly required
Before final approval Signed build contract, detailed plans and specifications, budget, valuation and required consents
Before the first drawdown Any outstanding approval conditions, required building consent, and confirmation of construction insurance
During construction Builder's invoices, evidence that the relevant work has been completed, and possibly progress valuations or council inspection records
At completion Final valuation or completion certificate, Code Compliance Certificate (CCC), outstanding invoices and full replacement house insurance noting the lender's interest

Requirements differ by bank and contract type. For example, Kiwibank identifies invoices, independent certification of completed work and possible interim valuations as part of its drawdown process. Borrowing to build | Home loansStarting your building or renovation projectApplying for a loan to build

4. A checklist you can start working through

Build-loan preparation

0 of 13 complete

Your documents

Gather income and employment evidence

Download bank statements and list all debts

Confirm the land title and any existing mortgage

Establish how much cash you can contribute

Builder's documents

Obtain a detailed quote and signed-contract draft

Get drawings and full specifications

Confirm inclusions, exclusions and contingency budget

Request the progress-payment schedule

Confirm consents, insurance and any building guarantee

Bank and professional checks

Ask the lender for its construction-loan document checklist

Arrange a registered valuation if required

Ask your solicitor to review the build contract and loan conditions

Confirm what is needed for the first drawdown

5. Three things worth checking early

  • How the bank values your land: ask whether it will use the current land value as equity towards the total project, and whether a mortgage already exists.
  • Whether your contract type is acceptable: a fixed-price contract may be assessed differently from a labour-only or cost-plus contract. Confirm the lender's requirements before committing.
  • Whether you have enough funding to finish: make sure your budget includes site works, connections, council fees, professional fees and a contingency for unexpected costs.

For the official bank-specific requirements, you can start with Kiwibank's guide to borrowing to build or ANZ's building and renovation guide.

One question so I can make this more specific

Have you already chosen your builder, and what type of build contract are you planning to use?

For example, a fixed-price contract with a building company, a labour-only contract, or managing the build yourselves. The paperwork and lending requirements can differ quite a bit between these options.

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 11 October 2026

Gemini · National

We own land and are getting ready to apply for a home-build loan. What documents will the lender want from us and the builder?

Getting a home-build loan (often called a construction loan or turn-key loan) in New Zealand involves a two-stage process: purchasing the land (if you don't already own it outright) and funding the construction itself. Because lenders release funds in stages (progress payments) as the build reaches specific milestones, they require robust documentation from both you (the borrowers) and your builder to mitigate their risk.


1. Documents Lenders Want From You (The Borrowers)

Banks and non-bank lenders need to verify your financial stability, ability to service the mortgage, and your equity (cash or land equity) in the project.

  • Proof of Income & Employment:
    • Recent pay slips (usually last 3 months).
    • 3 to 6 months of bank statements showing your everyday spending and savings habits.
    • IR3 tax returns and accountant's financial statements for the last 2 years if you are self-employed.
  • Asset and Liability Statement: A complete breakdown of your current assets (savings, vehicles, KiwiSaver, existing property) and liabilities (credit cards, personal loans, other mortgages).
  • Title for the Land: A copy of the Record of Title showing that you own the land (or the Sale and Purchase Agreement if you are in the process of buying it).
  • KiwiSaver Withdrawal Proof: If you plan to use KiwiSaver first-home withdrawal funds towards the build, a confirmation letter from your provider.

2. Documents Lenders Want From the Builder and Project

Because the lender will hold security over a property that is actively being constructed, they need to ensure the project is legally compliant, financially viable, and managed by qualified professionals.

  • Fixed-Price Building Contract: Lenders heavily prefer fixed-price contracts (such as a Master Builders or Certified Builders contract) rather than charge-up contracts, as they provide certainty around total costs and prevent budget blowouts.
  • Council-Approved Plans and Specifications: Detailed architectural and engineering plans. Most lenders will approve the loan in principle based on draft plans, but they will require the final Code Compliance Certificate (CCC) / Building Consent issued by the local council before the final funds are released.
  • Licensed Building Practitioner (LBP) Details: Proof that your builder is a registered LBP and holds a current license to carry out restricted building work.
  • Builder’s Risk Insurance / Home Warranty: Evidence of builders' all-risk insurance and a Halo / MasterBuild 10-year guarantee (or equivalent) to protect against structural defects.
  • Valuation Report: The bank will almost always commission an independent registered valuer to assess two values: the value of the land as-is, and the projected "as-completed" market value based on your building plans and specifications.
  • Detailed Cost Breakdown (Quantity Surveyor Schedule): A milestone payment schedule outlining the staged costs (e.g., base stage, frame stage, enclosed stage, lining stage, and final completion) so the bank knows exactly when to release progress payments.

Next Steps

To help tailor this advice to your specific situation, what stage are you currently at with your land and building plans?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 11 October 2026

Google AI Mode · National

We own land and are getting ready to apply for a home-build loan. What documents will the lender want from us and the builder?

Applying for a construction loan when you already own the land requires a bit more documentation than buying an existing property. Because lenders pay out funds in progressive drawdowns rather than a single lump sum, they need to thoroughly vet both your financial standing and the specifics of the build project.

The documents typically required by New Zealand lenders are broken down below:

1. Documents From You (The Borrowers)

Lenders need to verify your income, ongoing affordability, and your equity position just like a standard home loan, alongside proof related to the land:

  • Proof of Income and Financials: Recent payslips, 3 months of bank statements, IR3/tax returns if self-employed, and details of any existing debts, assets, or liabilities. [BNZ]

  • Proof of Equity / Deposit: Evidence of savings, KiwiSaver first-home withdrawal confirmations, or details of equity in the land you already own.

  • Land Ownership Evidence: Current Record of Title for the land.

  • Cost Contingency Budget: A comprehensive breakdown showing you have a buffer (usually recommended at 10% to 15% above the contract price) to cover unexpected cost overruns. [ANZ]

2. Documents From the Builder and Project

Lenders must ensure the project is legally compliant, financially viable, and managed by qualified professionals:

  • Signed Building Contract: A formal, written contract (such as a Master Builders or Registered Master Builders/NZ Certified Builders contract) detailing a fixed price or structured cost framework.

  • Detailed Plans and Specifications: Architectural or council-approved working drawings, floor plans, and material specifications outlining the quality and scope of the build.

  • Payment / Drawdown Schedule: A milestone-based schedule matching the construction stages (e.g., deposit, base/slab, frame, roof, enclosure, lining, and completion).

  • Builder Credentials: Evidence that your builder is a Licensed Building Practitioner (LBP) and holds appropriate builders risk insurance or guarantee insurances (like a 10-year Master Build Guarantee).

  • Council Building Consent: Approved consent documentation from the local council (or evidence that it is currently being processed/issued).

  • Registered Valuation ("As Is" and "Tentative on Completion"): A valuation report from an approved registered valuer who assesses the current value of your bare land and the projected market value of the finished house.

  • Specific Construction Insurance: Evidence of suitable House/Builder’s Risk insurance covering the property during the construction phase.

If you'd like, let me know:

  • Is your building contract fixed-price or cost-plus/labor-only?
  • Have you already received your Building Consent from the council?

I can give you a more tailored checklist based on your specific setup.

Ask anything

Captured 11 October 2026

AI Overviews · National

We own land and are getting ready to apply for a home-build loan. What documents will the lender want from us and the builder?

AI Overview

When applying for a home-build (construction) loan in New Zealand, the lender requires extensive paperwork to manage the distinct risks of a progressive drawdown mortgage. Because you already own the land, your application will focus heavily on proving your ongoing affordability and verifying the exact structure of the build contract.

Lenders assess these applications meticulously due to strict Responsible Lending Obligations and national Debt-to-Income (DTI) caps.

Documents Required From You (The Borrowers)

The lender needs to verify your financial stability, identity, and the exact equity or value held in your land.

  • Proof of Identity & Address: A valid New Zealand passport or driver's licence, paired with a recent utility bill or government letter matching your current address.

  • Income Verification: Your three most recent consecutive payslips. If you are self-employed, you must provide your latest two years of accountant-prepared financial statements and tax returns.

  • Bank & Debt Statements: At least three months of recent bank statements for all everyday accounts to assess living expenses. You will also need official statements detailing any existing credit cards, student loans, or personal debts.

  • Proof of Land Ownership: A copy of the Certificate of Title for your section, alongside the original Sale and Purchase agreement if purchased recently.

  • Registered Valuation: A formal "As-If-Complete" valuation from a registered, bank-approved valuer. This report estimates what the finished home and land package will be worth in the current market, which dictates your final Loan-to-Value Ratio (LVR).


Documents Required From the Builder

Lenders generally prefer a Fixed-Price Building Contract (often via standard Registered Master Builders or Certified Builders templates) to shield the project from unexpected budget blowouts.

  • Signed Fixed-Price Building Contract: This document must detail the total financial cost and explicitly state a breakdown of the progressive milestone payment schedule (e.g., deposit, slab down, framing, roof on, lock-up).

  • Council-Approved Plans & Specifications: A complete copy of the architectural drawings, engineering specifications, and construction details submitted to your local council.

  • Building Consent: Written confirmation or receipts showing that the local Council has granted (or is processing) the necessary Building Consents. Banks will issue conditional approval without this, but will not allow the first drawdown until it is formally issued.

  • Builder’s Insurance Certificates: Proof of comprehensive Contract Works Insurance held by the builder. This must remain active to cover the project against damage, fire, or theft throughout the entire physical build phase.


If you want to map out your timeline, let me know:

  • Have you already selected a Registered Master Builder or Certified Builder?

  • Has your local council already issued the Building Consent?

  • Are you planning to include provisional sums for earthworks or utilities in the loan?

I can help you prepare for the specific milestones your bank will look for.

Ask anything