Evidence · NZ Election 2026 · Edition 2

Every question, every answer, every source

All 174 questions and the 793 answers produced on 12 October 2026. The 27 remaining cells produced no AI Overview.

questions
174
answers saved
793
collected
12 Oct 2026

01

Every question, with its answers

Each question was written as a voter would ask it and went to all four assistants. Some were also asked from a town. Open a question to read every answer to it in full.

Showing 20 of 174 questions

02

The tables behind the study

Every figure on the study page comes from these tables. They are CSV files, which open in any spreadsheet.

  • Questions

    nz-election-2026-questions.csv

    One row per unchanged question.

    id, draft, text, voterCode, issue, towns

  • Answers

    nz-election-2026-answers.csv

    One row per produced answer, with its complete original text.

    result id, prompt id, draft id, scenario id, platform, region, words, parties, literal url answer, associated source answer, temporal pair, common four platforms, response text

  • Sources by answer

    nz-election-2026-sources.csv

    One row per website associated with an answer; repeated citations count once.

    answer id, question id, assistant, region, domain, publisher

  • Checks against official sources

    nz-election-2026-checks.csv

    One row per reviewed proposition, retaining both answers, extracts and the reviewed change.

    check, draft id, platform, claim, verdict, assessment, source url, source label, source date, checked date, old result id, new result id, old excerpt, new excerpt

  • Who to vote for: coding

    nz-election-2026-guidance.csv

    One row per manually reviewed guidance answer. Codes overlap; original answers supply the evidence.

    draft, assistant, q, voter, a, declined, matched, shortlist, asked, chose, extract

  • Location and national answers

    nz-election-2026-towns.csv

    One row per matched national/location pair, with both editions.

    prompt id, draft id, scenario id, issue, platform, city, edition 1 same party set, edition 1 national result, edition 1 city result, edition 2 same party set, edition 2 national result, edition 2 city result

  • Changes between editions

    nz-election-2026-comparisons.csv

    One row per identical question, assistant and location across the two collections.

    prompt id, draft id, scenario id, scenario, issue, platform, region, old result id, new result id, old words, new words, same party set, old parties, new parties, added parties, removed parties, literal same domains, literal old domains, literal new domains, literal added domains, literal removed domains, associated same domains, associated old domains, associated new domains, associated added domains, associated removed domains

  • No AI Overview produced

    nz-election-2026-coverage.csv

    One row per planned cell where no AI Overview was produced.

    prompt id, platform, region, draft id, block, scenario id, scenario, issue, priority, question, cause, availability

Use these tables to trace findings back to the original questions and answers. The full text of each answer is also on this page, under its question.

03

Read in full and checked

Some answers were read in detail or checked against official sources. Those appear on the study page, beside the findings they support.

ChatGPT · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

New Dunedin Hospital: what patients can expect in October 2026

For someone living in Dunedin who relies on specialist appointments, the most important distinction is between the hospital project being under construction and the hospital actually delivering care. A new building does not automatically mean that every specialist service, diagnostic test, operating theatre or inpatient bed is available in it.

For patients across Otago and Southland, the practical questions are whether services have moved, whether capacity has increased, and when the remaining facilities will be ready.

I'll separate the current operating position from the construction programme and its projected milestones, using information available as at 11 October 2026. I'll also distinguish confirmed dates from targets, because planned opening dates can change.

1. What is open now — and what opens tomorrow?

As at Sunday 11 October 2026, the key development is that the new outpatient building has been completed and officially opened, but its first patients are scheduled to be seen on Monday 12 October 2026. So, strictly speaking, its public opening ceremony and its start of clinical care are two different milestones. New Dunedin Hospital outpatient building officially opensNew Dunedin Hospital outpatient building opens to patients on Monday

New outpatient building

Patient care starts 12 Oct

Whare Mātūtū · 360 Cumberland Street

New inpatient building

Under construction

Former Cadbury site · patient opening planned for 2031

Services moving into the new outpatient building

Health New Zealand confirms the building will bring together specialist consultations, planned imaging and day procedures. Its published service information lists the following facilities: New Dunedin Hospital OutpatientsNew Dunedin Hospital Outpatients

  • Specialist clinics: medical and surgical outpatient appointments, allied health and clinical physiology, including services across areas such as orthopaedics, eye care, respiratory medicine, and children's and women's health.
  • Medical imaging: planned MRI, CT, X-ray and ultrasound appointments.
  • Day procedures: a dedicated unit with four operating theatres, four procedure rooms, and pre- and post-procedure care.
  • Other outpatient care: services such as physiotherapy and hand therapy.

The building is at 360 Cumberland Street, with outpatient clinics generally operating on weekdays. Not every clinic or service moves at once: some appointments will remain at the existing hospital or other locations, and the transfer is being phased. New Dunedin Hospital OutpatientsNew Dunedin Hospital Outpatient Building officially opened today

What does that mean for specialist patients?

The new facility is intended to increase capacity, not just provide newer surroundings. Once fully staffed and operational, Health New Zealand and the Government expect it to support approximately:

13,300

Additional medical imaging appointments per year

1,700

Additional day-surgery procedures per year

2,700

Additional medical day-stay appointments per year

These are projected additional annual volumes once the building is fully operational, not a count of extra appointments already delivered. New Dunedin Hospital outpatient building officially opensNew Dunedin Hospital outpatient building opens to patients on Monday

For someone who needs regular specialist care, those figures are relevant because imaging and day procedures can be part of diagnosis, monitoring and treatment. But they are capacity forecasts, not a guarantee of shorter waits for every specialty. The actual benefit will depend on staffing, clinic schedules, demand and how effectively the new capacity is used.

2. What is still being built or moved?

The hospital is being delivered in two main stages, and the distinction matters because the second stage contains much of the hospital's core acute and inpatient capacity.

Stage 1 — Outpatient building

First patients: 12 October 2026

The building is complete. Staff, equipment and services are transitioning into it, with further moves expected through early 2027. Specialist outpatient clinics, planned imaging and day procedures are the main focus of this stage. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital

Stage 2 — Inpatient building

Patient opening planned for 2031

The 11-storey building on the former Cadbury factory site is under construction. Foundation work has progressed to the main structural build, with steel erection beginning in July 2026. It is scheduled for practical completion in late 2030, followed by preparation and transition before patients are admitted in 2031. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital takes shape as steel goes up

Which services will still be at the existing hospital?

Until the inpatient building opens, the current Dunedin Hospital at 201 Great King Street remains essential to the region's hospital care. Health New Zealand identifies these services as remaining at the existing campus for now:

  • The emergency department.
  • Inpatient wards and the main surgical theatres.
  • BreastCare.
  • The NZ Artificial Limb Service.
  • Gibson Day Unit.
  • Childcare and corporate functions.

The inpatient wards, surgical theatres and emergency department are among the services intended to transfer to the new inpatient building when it opens. New Dunedin HospitalDunedin Hospital

Important: the new outpatient building is not a replacement emergency department. It does not provide the new inpatient wards or the full new acute-care hospital. If you need emergency care, continue to go to the existing emergency department.

3. The expected timeline

Here is the timeline based on Health New Zealand's project information and the latest published opening announcements.

28 Aug

2026

Outpatient building officially opened

The building's opening ceremony took place; commissioning, equipment checks and staff preparation continued. New Dunedin Hospital outpatient building officially opensNew Dunedin Hospital Outpatient Building officially opened today

12 Oct

2026

First outpatient patients

Clinical services begin operating in Whare Mātūtū. Patients should follow the location stated in their individual appointment information. New Dunedin Hospital outpatient building opens to patients on Monday

Early 2027

Further outpatient moves

Other services are expected to transfer as the new building becomes fully operational. Health New Zealand does not publish one universal transfer date for every clinic. New Dunedin Hospital

Late 2030

Target for practical completion

The main inpatient building is scheduled to reach practical completion. This is a construction milestone, not the date all patients move in. New Dunedin Hospital takes shape as steel goes up

2031

New inpatient hospital expected to receive patients

The new emergency department, inpatient wards, operating theatres, intensive care and other acute-care facilities are planned to become operational. New Dunedin HospitalNew Dunedin Hospital takes shape as steel goes up

These are published targets, not guarantees that every milestone will happen exactly on schedule. The latest project information identifies 2031 as the inpatient opening year; it does not establish a confirmed day for the first inpatient admissions.

4. What the completed hospital is supposed to deliver

The inpatient building is where the wider project will deliver its most substantial changes to acute hospital capacity.

Planned feature at opening Published provision
Inpatient beds 351
Potential future bed capacity 404
Operating theatres 22, with provision to expand to 24
Short-stay surgical beds 20
Emergency department spaces 58
Imaging units 20, with provision for 6 additional spaces

These are the Government's announced specifications for the new hospital, rather than a statement of what is available to patients today. Decision reached on Dunedin HospitalNew Dunedin Hospital

For Otago and Southland, the intended benefits are a more modern regional specialist hospital, additional capacity for planned treatment, a larger emergency department and facilities designed around contemporary clinical practice. The new inpatient and outpatient buildings are also intended to connect, with an overhead bridge across St Andrew Street. New Dunedin HospitalNew Dunedin Hospital Inpatient Building begins to rise from the ground

There is an important difference between building capacity and delivering access. More beds and theatres provide the physical ability to treat more people, but actual results also depend on having enough doctors, nurses, technicians and other staff, and on funding the services that operate in those spaces.

5. What to check for your own specialist appointments

Because the outpatient transition is happening now, practical details may matter more to you in the short term than the headline construction dates.

  • Check every appointment letter, text or email. Do not assume that your usual clinic has moved just because the new building has opened.
  • Confirm the location if you have a recurring appointment. Some clinics may be in Whare Mātūtū at 360 Cumberland Street, while others remain at the existing hospital or another site. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital Outpatients
  • Ask whether the new building changes your pathway. For example, whether your specialist consultation and imaging can be arranged in the same location, or whether you will still need to travel between sites.
  • Ask about actual waiting times and capacity in your specialty. The additional annual appointment estimates are across services, not a guarantee of faster access for any one condition.

For people who need to travel to Dunedin from elsewhere in Otago or Southland, the outpatient building's official information also lists Hato Hone St John Waka Ora health shuttles serving several areas, including Invercargill, Gore, Oamaru and Cromwell. National Travel Assistance may also help eligible patients who travel long distances or frequently for treatment. See the official outpatient building information. New Dunedin Hospital Outpatients

6. How to use this information when considering your 2026 vote

The hospital's progress gives you several concrete things to assess, without needing to take any party's claims at face value.

  • Delivery: Are the outpatient services opening and moving on the announced timetable, and is the inpatient building progressing toward its 2031 target?
  • Access: Are actual specialist waiting times, diagnostic delays and elective treatment volumes improving, rather than simply the number of rooms increasing?
  • Staffing and operating funding: What commitments are parties making about recruiting and retaining staff and funding enough clinical sessions to use the new facilities?
  • Regional access: How will parties support patients who need to travel from across Otago and Southland, particularly people with ongoing conditions and frequent appointments?
  • Accountability: Will parties publish measurable results on waiting times, completed treatments, staffing and the hospital's delivery milestones?

These questions help separate the building project—which is now delivering its first outpatient stage—from the broader health-service decisions that determine how much care patients actually receive.

For primary-source updates, the best starting point is Health New Zealand's New Dunedin Hospital project page, alongside the official outpatient service information.

The bottom line is that the first new clinical building begins seeing patients on 12 October 2026, but the new inpatient hospital—including the replacement emergency department, wards and main acute-care facilities—is not expected to receive patients until 2031. The near-term test is whether outpatient capacity translates into better access; the longer-term test is whether the completed hospital has the staff and operating resources to deliver the care its design promises.

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 12 October 2026 · shown as ChatGPT gave it, not a verified account

ChatGPT · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

New Dunedin Hospital: what patients will actually get, and when

Status as at 11 October 2026 · Dunedin, Otago and Southland

The key distinction for your decision ahead of the 2026 New Zealand general election is that the new hospital is opening in stages, not as one fully functioning hospital. The outpatient building is ready to begin treating patients, while the larger inpatient building is still under construction and is not expected to receive patients until 2031. New Dunedin HospitalNew Dunedin Hospital outpatient building opens to patients on Monday

That matters if you rely on regular specialist appointments: the first stage brings new clinics, scans and day procedures into a purpose-built facility, but emergency care, inpatient treatment and major hospital services remain at the existing Dunedin Hospital for now.

Outpatients | Whare Mātūtū, at 360 Cumberland Street, is the first completed clinical building of the new hospital project.

1. What is open now?

There is an important date distinction: Health New Zealand announced that the outpatient building would start treating patients on Monday 12 October 2026. As today is Sunday 11 October, the building has been officially opened, but its first scheduled day of patient care is tomorrow. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital Outpatient Building officially opened today

Outpatients | Whare Mātūtū

Patient services start 12 October

360 Cumberland Street, Dunedin

This five-storey, 15,000 m² building will bring many specialist outpatient clinics, diagnostic imaging and day procedures together. Patients should attend here only when their appointment information confirms the new location. New Dunedin Hospital OutpatientsNew Dunedin Hospital outpatient building opens to patients on Monday

Services provided in the new building

  • Specialist medical and surgical outpatient clinics, including children's and women's services.

  • Orthopaedics, eye care, respiratory medicine, physiotherapy, hand therapy and other specialist clinics.

  • Radiology and outpatient imaging, including X-rays, ultrasound, CT and MRI.

  • Day surgery and procedures, with pre- and post-procedure care.

    Not every clinic moves on the same day. Some appointments will continue at the existing hospital or other locations during the transition. New Dunedin Hospital OutpatientsNew Dunedin Hospital Outpatient Building officially opened today

What does this mean for someone with a long-term condition?

The new outpatient facility is the first stage most likely to affect your routine care directly.

  • Specialist appointments: clinics are being brought together in a modern facility, with digital check-in and wayfinding.
  • Tests and scans: the building has dedicated imaging services, which may make it easier to access diagnostics in the same location as specialist care.
  • Day procedures: four operating theatres and four procedure rooms are provided in the Day Procedure Unit.
  • Getting around: accessible entrances, lifts, mobility support and digital directions are available to help patients navigate the building. New Dunedin Hospital OutpatientsNew Dunedin Hospital Outpatient Building officially opened today

These are real improvements in facilities and service capacity. They are not, by themselves, proof that waiting lists will shorten or that every patient will get an earlier appointment. That depends on staffing, clinic schedules, operating capacity and demand.

2. What is still being built or moved?

Inpatient building

Under construction

The 11-storey, approximately 72,000 m² building on the former Cadbury factory site is the second stage. Foundation work has progressed to the installation of structural steel, with the main construction phase continuing towards completion in 2030. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital takes shape as steel goes up

Existing Dunedin Hospital

Still operating

The current hospital remains essential to regional care. Its emergency department, inpatient wards, intensive care, maternity services and operating theatres continue to provide care while the new inpatient building is built. Dunedin HospitalNew Dunedin Hospital

Transfer and connection of services

Expected through 2031

Outpatient services are moving in stages, with further transitions expected by early 2027. When the inpatient building opens, inpatient wards, operating theatres and the emergency department are planned to transfer to the new facility, which will be connected to the outpatient building by an overhead bridge. New Dunedin HospitalNew Dunedin Hospital Outpatients

What will the inpatient building deliver?

When operational, the second building is intended to provide the acute hospital facilities that the outpatient building does not have.

Initial inpatient capacity

351 beds

Published project overview; further capacity is planned.

Emergency department

58 spaces

Including short-stay and specialist emergency psychiatric care.

Operating theatres

22

Designed for expansion to 24.

Expansion potential

404 beds

Published project overview; capacity is not the same as staffed beds.

Figures from Health New Zealand's current project overview. The planned bed mix and future fit-out have been revised since the original business case, so older published capacity figures may differ. New Dunedin HospitalNew Dunedin Hospital design updated to reflect standardised national modelling for regional hospitals

The planned services include:

  • Expanded emergency care and short-stay surgery.
  • Intensive care and high-dependency beds.
  • Inpatient medical and surgical wards.
  • A larger operating theatre suite.
  • More modern clinical spaces, with infrastructure designed for earthquake resilience and future expansion. New Dunedin HospitalConstruction on New Dunedin Hospital resumes

For patients needing complex surgery, admission, emergency treatment or intensive care, this second stage is the more direct change to the hospital environment in which they receive care.

3. The timeline: what is expected, and when?

The latest published Health New Zealand project overview and government updates give this sequence. The dates for the inpatient building are targets, not guarantees. New Dunedin HospitalNew Dunedin Hospital takes shape as steel goes up

Aug

2026

Outpatient building officially opened

The building was formally opened on 28 August. Clinical commissioning, staff training and preparation continued afterwards. New Dunedin Hospital Outpatient Building officially opened todayNew Dunedin Hospital outpatient building officially opens

12 Oct

2026

First patients at Whare Mātūtū

Specialist outpatient, imaging and day-procedure services begin treating patients. The transition of services continues into late 2026. New Dunedin Hospital outpatient building opens to patients on MondayNew Dunedin Hospital

Early

2027

Further outpatient moves

Health New Zealand expects additional services to relocate by early 2027. Check your individual appointment details rather than assuming your clinic has moved. New Dunedin HospitalNew Dunedin Hospital Outpatients

2026–30

Construction

Inpatient building rises

The main construction phase is under way, following foundation work and the start of structural steel installation in July 2026. Practical completion is scheduled for late 2030. New Dunedin Hospital Inpatient Building begins to rise from the groundNew Dunedin Hospital takes shape as steel goes up

2031

Expected

Inpatient hospital begins receiving patients

The new inpatient building is expected to open, allowing the major acute-care services to transfer. Commissioning and the staged transfer of services mean practical completion in 2030 is not the same as treating the first patient. New Dunedin Hospital takes shape as steel goes upNew Dunedin Hospital

4. What extra treatment capacity is promised?

Health New Zealand says that, once the outpatient building is fully staffed and operational, its additional capacity is expected to support approximately:

1,700

additional day-surgery procedures per year

13,300

additional medical imaging appointments per year

2,700

additional medical day-stay appointments per year

Source: Health New Zealand's August and October 2026 announcements. These are expected additional annual volumes when the facility is fully operational, not a report of extra appointments already delivered. New Dunedin Hospital Outpatient Building officially opened todayNew Dunedin Hospital outpatient building opens to patients on Monday

For people across Otago and Southland, these figures matter because Dunedin is a regional specialist centre: improved imaging and day-procedure capacity could benefit patients who otherwise face longer waits or repeated visits. But the figures are projected capacity, not a guarantee of shorter waits for every specialty.

There is also a significant qualification on beds. Health New Zealand has revised the original bed model to reflect national planning assumptions about future demand and more care being delivered outside hospital. Its updated information refers to 424 overnight beds in total, including spaces reserved for future fit-out, while the project overview describes 351 beds at opening and potential expansion to 404. These figures use different capacity definitions and should not be treated as interchangeable counts of staffed beds available on day one. New Dunedin Hospital design updated to reflect standardised national modelling for regional hospitalsNew Dunedin Hospital

5. What should you examine before voting in 2026?

The most useful way to assess the hospital is to separate the physical project from the services patients can actually access.

Issue What the evidence currently says
Building delivery The outpatient building is ready to begin clinical operations; the inpatient building is targeted to open in 2031.
Specialist access Additional imaging, day surgery and day-stay capacity is forecast, but actual waiting-time outcomes remain to be demonstrated.
Inpatient capacity The planned facility is larger and modernised, but the bed mix and timing of fit-out have changed since the original business case.
Delivery oversight A Crown Manager was appointed to oversee the inpatient project after concerns about cost pressures, delays and Health NZ's delivery capability.
Long-term service delivery Buildings need staffing, operating budgets, equipment and functioning referral pathways to translate into patient care.

Sources: Health New Zealand's project information, updated capacity statement and Ministry of Health Cabinet material. New Dunedin HospitalNew Dunedin Hospital design updated to reflect standardised national modelling for regional hospitalsCabinet material: Appointment of a Crown Manager to the New Dunedin Hospital inpatient building projectBriefing for decision

The Crown Manager appointment is particularly relevant to accountability. Cabinet's June 2025 decision recorded concerns about fiscal risk and the consequences for health services if the project experienced further cost increases or delays. The appointment was intended to strengthen oversight of delivery. Microsoft Word - H2025068289 - Cabinet Cover BriefingTerms of Reference - Crown manager to the New Dunedin Hospital

For a fair comparison of election promises, ask each party or candidate:

  • Timetable: Will they retain the planned 2031 opening, and what milestones will they publish to demonstrate progress?
  • Staffing: What will ensure the new theatres, clinics, imaging services and beds are staffed and operational?
  • Waiting lists: How will they measure whether the promised extra capacity produces shorter waits for specialist appointments, scans and elective procedures?
  • Bed availability: How many inpatient and intensive-care beds will be staffed and available at opening, and when will spaces reserved for future fit-out become usable?
  • Regional access: How will people travelling from Southland and rural Otago get to appointments, and will the added capacity improve access across the whole Southern district?

These questions help distinguish a commitment to finish a building from a commitment to deliver a measurable level of healthcare.

6. Practical advice for your next specialist appointment

The new outpatient building's address is 360 Cumberland Street, Dunedin. The existing hospital is at 201 Great King Street.

  • Check your appointment letter, text or email for the exact location. Not all services are moving at once.
  • If the location is unclear, contact the service listed on your appointment before travelling.
  • For eligible patients who travel long distances or frequently for care, Health New Zealand lists the National Travel Assistance Scheme. Hato Hone St John also operates Waka Ora health shuttles serving Dunedin and a number of Otago and Southland communities. New Dunedin Hospital OutpatientsDunedin Hospital

Official information: New Dunedin Hospital — Project Whakatuputupu · Outpatients | Whare Mātūtū — patient information

Bottom line: As of 11 October 2026, the first stage is about to start delivering specialist outpatient care, diagnostics and day procedures. The more substantial change for emergency care, inpatient treatment and intensive care remains dependent on the second building, with patients expected there in 2031. For your vote, the key question is not only who promises to complete the hospital, but who can show how its planned capacity will translate into staffed services and timely treatment for people across Otago and Southland.

Ask anything

ChatGPT can make mistakes. Check important info.

Captured 12 October 2026 · shown as ChatGPT gave it, not a verified account

Gemini · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

For patients in Otago and Southland relying on specialist appointments and managing long-term health conditions, the New Dunedin Hospital project represents a major election talking point following years of budget reviews, public advocacy, and design shifts.

The project is split into two primary buildings (the Outpatient Building and the Inpatient Building) on the former Cadbury factory site.


What is Open and Treating Patients Now?

  • The Outpatient Building (Whare Mātūtū): Construction on this five-storey facility was completed, and it was officially opened by the Government.
  • Services Provided Here: This building hosts ambulatory services, specialist outpatient clinics, planned radiology, day procedures and medical units, pathology, and a transit care unit. If you have scheduled non-acute specialist consultations or day procedures, they are transitioning into or operating out of this purpose-built facility.
  • The Legacy/Current Hospital: For acute care, emergency services, intensive care, and inpatient wards, patients are still largely reliant on the aging legacy Dunedin Hospital buildings while waiting for the main inpatient block to be finished.

What is Still Being Built or Moved?

  • The Inpatient Building: Following major public backlash and subsequent government contract agreements with CPB Contractors to lock in a $1.88 billion budget envelope, major construction on the core inpatient complex resumed.
  • Capacity Scale: Following the government's redesign decisions, the final inpatient building will deliver 351 beds (with futureproofing capacity to expand to 404), 22 operating theatres, 58 emergency department spaces (including short-stay and psychiatric emergency care), and 20 imaging units.
  • Context on Cuts: Community advocates and health unions have heavily scrutinized the final blueprint because it represents a scaling-down from earlier projected numbers (such as fewer rehabilitation and mental health-associated beds compared to initial 2022/2023 plans), which remains a central debate for regional voters.

Expected Timeline and Completion Stages

  • Late 2026: The Outpatient Building officially opens its doors to patients across Otago and Southland.
  • Mid-2025 to December 2030: Following the resumption of main works construction contracts, the expected construction completion date for the Inpatient Building is targeted for late 2030 / December 2030.

As you weigh your vote in the 2026 general election, do you want to focus more on the debate around the hospital's reduced bed capacity, or on the funding and delivery timelines for the remaining 2030 inpatient stage?

Ask Gemini

Gemini is AI and can make mistakes.

Captured 12 October 2026 · shown as Gemini gave it, not a verified account

Gemini · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

As a patient living in Dunedin with a long-term health condition, navigating specialist appointments and evaluating your vote for the 2026 general election, understanding the precise status of the new Dunedin Hospital build is critical.

The project—officially structured in stages under Project Whakatuputupu—has experienced considerable redesigns, scope debates, and budget adjustments over recent years.


What is Open and Treating Patients Now?

  • The Existing Dunedin Hospital (Current Facilities): As of October 2026, no patients are being treated in the new hospital buildings yet. All acute care, inpatient wards, emergency services, and specialist outpatient clinics continue to operate out of the older, existing Dunedin Hospital facilities (and temporary modular/leased spaces across the city).
  • The Outpatient Building (Final Stages): The five-storey Outpatient Building (the first major stage on the former Cadbury site) is wrapping up construction, with completion milestones falling around late 2026. While construction is concluding or nearing handover, it is entering its commissioning, fit-out, and transition phases ahead of welcoming its first outpatient clinics.

What is Still Being Built or Moved?

  • The Outpatient Building (Fit-Out & Transition): Structurally finished or finishing up around late 2026, this building still requires extensive installation of digital health infrastructure, specialist medical equipment, and staff migration planning before specialist outpatient appointments formally shift over from the old site.
  • The Inpatient Building (Main Block): Construction on the much larger Inpatient Building is actively underway (with structural steel components arriving on site through mid-2026). This facility will house acute services, operating theatres, and inpatient beds.

Expected Dates and Timeline Stages

  • Late 2026: Completion of the Outpatient Building construction phase, followed by the phased transition and opening of outpatient and day-patient services.
  • 2031: Scheduled completion target for the main Inpatient Building.

Context for Your Healthcare and the Election

For patients relying on specialist care, the ongoing debate centers on capacity, scope, and delivery timelines. Reductions in bed numbers, cuts to operating theatres, or scaled-back ancillary spaces in earlier government-led scope reviews have been major political lightning rods across Otago and Southland. When considering your vote, key questions to put to candidates involve binding guarantees on the 2031 inpatient completion date, funding for full clinical staffing, and ensuring that outpatient services transitioning into the new building are adequately resourced to cut down specialist waitlists.

Ask Gemini

Gemini is AI and can make mistakes.

Captured 12 October 2026 · shown as Gemini gave it, not a verified account

Google AI Mode · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

As a patient in Dunedin relying on specialist care, navigating what the new infrastructure actually delivers is crucial—especially when weighing up local health services and future commitments in the lead-up to the general election.

The New Dunedin Hospital project (known as Project Whakatuputupu) is rolling out in distinct phases across separate buildings.

1. What is Open and Treating Patients Now

  • The Outpatient Building (Whare Mātūtū): This five-storey, 15,000-square-metre facility is officially open to patients.

  • Services Provided Here: It brings a wide range of outpatient, diagnostic, and day-procedure services under one roof. This includes outpatient clinics , day procedures , and radiology services (such as X-rays, MRIs, and CT scans).

  • What Remains on the Old Site: Acute inpatient beds, emergency care, major surgeries, and complex inpatient services are still operating out of the current Dunedin Hospital on Great King Street while later stages progress. [Health New Zealand | Te Whatu Ora]

2. What is Still Being Built or Moved

  • ** The Inpatient Building :** This is the much larger, 11-storey clinical and acute services block (approx. 72,000 square metres) designed to house hundreds of inpatient beds, operating theatres, intensive care, and an expanded emergency department. [Health New Zealand | Te Whatu Ora]

  • Transition Status: The structural and internal fit-out phases for this main acute/inpatient block are still underway, and services will transition over incrementally once construction concludes. [Health New Zealand | Te Whatu Ora]

3. Expected Dates for the Different Stages

  • Outpatient Phase: Operational as of October 2026, with full migration of remaining outpatient and associated diagnostic services completing into early 2027.

  • Inpatient Phase: Expected to open in 2031 , following adjustments, budget caps, and construction timelines managed via Health New Zealand | Te Whatu Ora.

If you'd like, I can help you look into:

  • Specific specialist clinic transitions moving into the new outpatients facility
  • Regional health funding or political party policies regarding the 2031 inpatient timeline

Let me know how you'd like to proceed with your research.

Ask anything

Captured 12 October 2026 · shown as Google AI Mode gave it, not a verified account

Google AI Mode · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

Navigating specialist appointments with a long-term health condition means you need practical, reliable information—especially when weighing up how public health infrastructure impacts your care and your vote.

As of October 12, 2026 , the New Dunedin Hospital Project Whakatuputupu is rolling out in distinct phases.


What is Open and Treating Patients Now

  • Outpatient Building (Whare Mātūtū): Formally opening its doors to patients on Monday, October 12, 2026.

  • What it delivers: This brand-new, five-storey, 15,000 square-metre facility is the first completed clinical building. It brings a wide range of specialist outpatient clinics, diagnostic services, radiology, and day-procedure services together under one roof.

What is Still Being Built or Moved

  • Ongoing Outpatient Transition: While the building opens today, a phased transition means many specialist outpatient and day services are moving in now, with additional related services continuing their migration into early 2027. [Health New Zealand | Te Whatu Ora]

  • The Inpatient Building (Stage 2): Construction work on the major 11-storey inpatient building (on the old Cadbury site) resumed under CPB Contractors. Crews are currently working on foundational substructures and piling. This building will eventually be connected to the outpatient building via an overhead bridge across St Andrew Street.

  • Services Remaining at the Old Campus: Critical acute care services—including the Emergency Department, inpatient wards, surgical theatres, BreastCare, and the NZ Artificial Limb service—will remain anchored on the existing Dunedin Hospital campus until the secondary stage is completed. [Health New Zealand | Te Whatu Ora]

Expected Dates for Different Stages

  • October 2026: Outpatient Building (Whare Mātūtū) begins accepting its first wave of specialist outpatient appointments.

  • Late 2026 – Early 2027: Gradual transition of remaining scheduled outpatient clinics and day services into the new facility.

  • 2031: Expected opening and first patient intake for the major 11-storey Inpatient Building.


If you'd like, I can share:

  • Details on which specific specialist services are moving into the Outpatient Building versus staying at the old site
  • How to check with Health New Zealand Southern regarding your upcoming appointments during the transition

Let me know how you'd like to proceed.

Ask anything

Captured 12 October 2026 · shown as Google AI Mode gave it, not a verified account

AI Overviews · No location

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

AI Overview

The New Dunedin Hospital Outpatient Building (Whare Mātūtū) officially opened to its very first patients on Monday, 12 October 2026. This marks the completion of the first major milestone of Project Whakatuputupu, bringing a wave of newly built specialist facilities online for the 350,000 residents of Otago and Southland.

As you consider your vote for the 2026 election, here is an objective breakdown of what is treating patients right now, what is currently under construction, and the official timelines.


🏥 What is Open and Treating Patients Now (As of October 2026)

The brand-new, five-storey Outpatient Building is now active. Because you rely on specialist appointments for a long-term condition, this is the exact building where most of your planned, non-emergency hospital care will take place.

The services operating out of this new building include:

  • Specialist Clinics: Dedicated clinics for orthopaedics, ophthalmology (eye care), and children’s/women’s health.

  • Day Surgery & Procedures: A full operating suite on level three featuring four operating theatres and four procedure rooms. This separates planned day surgeries from emergency disruptions.

  • Planned Radiology: Newly expanded scanning capacity including MRI, CT, X-ray, and ultrasound.

  • Medical Infusion Unit: Modernized spaces for patients requiring scheduled intravenous therapies or specialized infusions.

  • Digital Integration: The building is fully digitalized, featuring public Wi-Fi, digital wayfinding, smart appointment scheduling, and integrated health records to streamline patient check-ins.

🏗️ What is Still Being Built or Moved

Everything related to acute care, emergency medicine, and overnight hospital stays remains at the old Dunedin Hospital site for now.

  • The Inpatient Building: This is the massive, 11-storey companion building being constructed next door. Structural vertical steel works began in mid-2026. Once finished, it will house the Emergency Department (ED), intensive care units (ICU), overnight wards, and main operating theatres.

  • Phased Relocation: Over the coming months into early 2027, further day-stay and diagnostic services will continue a phased transition into the newly opened Outpatient Building to ensure minimal disruption to existing patients.

  • Overhead Link Bridge: A physical bridge designed to connect the Outpatient and Inpatient buildings will be completed later in the project timeline.

📅 Expected Project Timelines

  • October 2026 (Current): Outpatient Building opens to the public and begins clinical care.

  • Early 2027: Full transition of all designated outpatient and day-stay clinical services into Whare Mātūtū is finalized.

  • 2031: The Inpatient Building is scheduled to complete construction and open to patients, fully consolidating the new central health campus.


If you have specific questions about a particular medical specialty or want to know more about the political debate surrounding the hospital's capacity, let me know. I can highlight the specific changes to bed numbers or detail the differences between political parties' funding promises for the remaining build.

Ask anything

Captured 12 October 2026 · shown as AI Overviews gave it, not a verified account

AI Overviews · Dunedin

I live in Dunedin, have a long-term health condition and rely on specialist appointments. I want to know what the new hospital will actually deliver for patients in Otago and Southland. I am considering my vote in the 2026 New Zealand general election. What is actually open and treating patients at the new Dunedin Hospital now, what is still being built or moved, and what are the expected dates for the different stages?

AI Overview

The Outpatient Building (Whare Mātūtū) has officially opened and is treating patients. This five-storey facility began clinical operations on Monday, 12 October 2026 , making it the first completed clinical section of the New Dunedin Hospital.

Because you rely on specialist appointments for a long-term condition, this is the building where most of your ongoing, scheduled care will take place.


🏥 What is Open and Treating Patients Now

The Outpatient Building (Whare Mātūtū) is fully complete. Key features active now or transitioning over the coming weeks include:

  • Specialist Clinics & Ambulatory Care: Dedicated spaces for consultation and targeted long-term condition management.

  • Diagnostics & Planned Radiology: Advanced imaging, including the site's new MRI machines, to support faster diagnosis.

  • Day Procedures & Infusion Units: Facilities for non-overnight surgeries, treatments, and regular medical infusions.

  • Modern Amenities: Integrated digital wayfinding, self-check-in kiosks, and improved physical drop-off zones.

Note: While the first wave of clinics started on 12 October 2026, some complex outpatient specialties will continue a phased move, wrapping up byearly 2027 as additional staff are recruited.


🏗️ What is Still Being Built (The Inpatient Building)

The much larger, 11-storey Inpatient Building is actively under construction on the former Cadbury site. Lead contractor CPB Contractors has recently completed the deep foundational piling and has begun erecting the massive structural steel framework.

Once completed, this secondary building will house acute services and will be connected to your outpatient clinic building via an overhead link bridge. It will contain:

  • 351 to 404 inpatient beds

  • An expanded Emergency Department (ED)

  • Over 22 operating theatres and intensive care (ICU/NICU) suites New Dunedin Hospital | Project Whakatuputupu'Major milestone' as Dunedin Hospital outpatient building officiallyDispatches | New Zealand Doctor


⏳ Project Timeline and Key Dates

Project Stage / Milestone Current Status & Target Dates
Outpatient Building Construction Completed (July 2026)
Outpatient Clinics Operational Open now (Opened 12 October 2026)
Final Outpatient Move Phase Ongoing through Early 2027
Inpatient Structural Steel Phase Ongoing through 2026–2027
Inpatient Practical Completion Late 2030
Inpatient Building Opens to Patients Expected 2031

🗳️ Context for Your Vote

The Dunedin Hospital rebuild has been a significant point of political debate regarding budget adjustments, scaling, and timeline extensions. Separating planned outpatient care from acute inpatient workloads is intended to minimize appointment cancellations and delays for patients with chronic illnesses. The progress you see on Hanover/Castle Street today reflects the current Coalition Government's locked-in scope, aiming for full complex delivery by 2031.

If you would like to look into how the different political parties plan to manage healthcare wait times or future funding for the Southern region, let me know. I can also provide details on how to navigate the new digital self-check-in or where the specific patient drop-off zones are located for your next appointment.

Ask anything

Captured 12 October 2026 · shown as AI Overviews gave it, not a verified account